Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 CrAccepted-AOC | ₹2.0 Cr | 1 | Accepted-AOC Secured L1 Rank. |
| 2 | 2₹2.1 Cr+₹17.9 L (9.15%)Rejected-AOC 35 A FORT INDUSTRIAL ESTATE KILA MAIDAN INDORE 450006 INDORE | 450006 | ₹2.1 Cr+₹17.9 L (9.15%) | 2 | Rejected-AOC Secured L2 Rank. |
| 3 | 3₹2.2 Cr+₹25.9 L (13.2%)Rejected-AOC 7A SCHEME NO 71 DHAR ROAD INDORE INDORE MADHYA PRADESH 452002 | INDORE | MADHYA PRADESH | 452002 | ₹2.2 Cr+₹25.9 L (13.2%) | 3 | Rejected-AOC Secured L3 Rank. |
| 4 | 4₹2.3 Cr+₹29.2 L (14.9%)Rejected-AOC 28 A G SECTOR J K ROAD GOVINDPURA BHOPAL M P | BHOPAL | BHOPAL | MADHYA PRADESH | ₹2.3 Cr+₹29.2 L (14.9%) | 4 | Rejected-AOC Secured L4 Rank. |
| 5 | Rejected-Technical C 286 SECTOR 10 SECTOR 10 98112 GB NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | Rejected-Technical disqualified due to not submitted their technical bid in physical form as mentioned in tender documents. |
Tender Value
Refer Docs
EMD Value
₹4.4 L
Closing Date
2 Sept 2025, 3:00 pmClosed
ZONAL MANAGER
1/123 VINEET KHAND GOMTI NAGAR LUCKNOW
TENDER FOR INTERIOR, FURNISHING AND FURNITURE OF STPI BUILDING AT BAREILLY (UP)
2025_NPCC_246206_1
UPZ/361/STPI/BAR/INT/25-26/476
Open Tender
Civil Works
Percentage
90 days
STPI BAREILLY
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
National Projects Construction Corporation Limited
₹4.4 L
31 Oct 2025
23 Aug 2025
3 Sept 2025
23 Aug 2025
2 Sept 2025
23 Aug 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .