Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
22 Sept 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE,EDC-IV,LESA-CISS GOMTI,MVVNL
4/82-83, INDERLOK HYDEL COLONY, KRISHNANAGAR, LUCKNOW
Construction of Line and Giving Connection against Deposit Scheme Package No. 140 and 142/22-23 UNDER JURISDICTION OF E.E., EDD, CESS-I, CISS GOMTI, LESA, Lucknow
2022_MVVNL_727850_1
40/EDC-IV/LESA/2022-23
Open Tender
Miscellaneous Works
Fixed-rate
180 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C-1444100402,IFSC Code-CBIN0280139
₹16,000
27 Sept 2022
14 Sept 2022
22 Sept 2022
14 Sept 2022
22 Sept 2022
14 Sept 2022
Amount
Safe Loading, Carriage & unloading of following Materials from Centre Store to Pit Site/J.E. Dump Store.
a- Line Material
b- ST Pole 11 Mtr Long
c- 11 KV 3x185/3x120 sqmm XLPE cable
d- 11 KV 3x185/3x120 swmm XLPE OD CJ Kit
e- ACSR weseal Conductor
f- 11 KV Pin Insulator
g- 11 KV Pin with nut
h- Earthing Rod Complete
i- Stay Set Complete
j- 11 KV Pilfer
k- 11 KV TVM
l- 11 KV CT PT Metering Pole Mounted Unit
m- 11 KV Disc Insulator
n- 11 KV Disc fitting
Fabrication, erection of double pole for end terminations/sectional double pole, 11 KV line on ST Pole with fixing of necessary clamps & other accessories like 1 nos top channel 100x50 mm 2.24 m. 1 No. Guarding Angle. Its grouting in ratio 1:4:8 plinthing 300 mm above ground level, earthing of support & one side cable expose.
Grouting & Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand, Brick blast & cement). All material except stay wire shall be supplied by the contractor.
Ordinary earthing by 33 KV MS earth Rod 2500mm long as per RESPO Schedule. All material except earthing wire shall be supplied by the contractor.
Laying of 11 KV 3x180 sq. mm XLPE cable double circuit digging of trench 1050 mm deep, 750 mm side including supply of required material, 1st class bricks, stone pad & fine sand. The inter spacing between two cable should be in between 0.25 m to 0.40m. The cables shall be laid in trench by first filling layer of sand and laying on sides with bricks, fixing bricks as partitions between two cables, after laying cable, covering cable by stone pads resting on bricks, covering it by earth, all work as per RESPO norms. (Allmaterial required for laying will be supplied by the contractor except 11 KV XLPE cable). One lenght cable-2000 Mtr. Total lenght 4000 Mtr.
Cable Hosting of 11 KV 3x185 sq. mm XLPE Cable at the following including jumpering etc complete with help of GI Pipe as Per RESPO Norms. GI pipe and other required material shall be supplied by contractor.
High pressure testing of 11 KV 3x185/3x120 XLPE cable along with arrangement of High Pressure equipment.
Making of Heat & shrinkables joints of following sizes and types in 11 KV XLPE cable (Jointing kit will be provided by deptt.)
(i) Outdoor end termination kit for 11 KV 3x185/3x120 sqmm XLPE cable
Painting of new erected ST pole with two coat of Red oxide paint, PO red paint at top of pole 2 mtr and balance by two coats of best quality aluminium paint ISI of Berger/Nerolac/Asian paints as per norms. All material provided by contractor.
Supply and fixing of Allu Lug 240 mm sq. as per RESPO Norms. All Material will be provided by contractor.
Installation of 11 KV CT PT metering unit on constructed double pole structure as per RESPO Norms. Only 11 KV CT/PT unit shall be supplied by the Deptt.
Well type earthing of with 60 Fit Deep borring and providing GI Pipe 1.5" dia ("B" Class) and earthing must be joint by G.I. Strip of 32x5 mm thick long attached with nut & bolts and GI pipe cap. All material and labour shall be supplied the contractor.
Fixing of 11 KV Pilfer Resistance Meter (25/5 Amp). All material except Pilfer Resistance Metering Cubical shall be supplied by the contractor.
Installation of 11 KV TVM METER along with Providing and fixing of Ms flat 50x6 (2080mm) 2 no with clamp nuts and bolts.
GST Extra as per Rules
dev engineering corporation
M R P CONSTRUCTION
CHAUHAN ELECTRICALS
M/S MANSA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .