Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,860
Closing Date
29 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(VP),Panchayat union,KPT
Block Development Officer(VP),Panchayat union,KPT
Construction of Kitchen Shed in P.U.M.School at Thamaraikulam Village and Thulukkankulam panchayat
2022_RDTN_262667_1
B2/2320/2022 02/11/2022
Open Tender
Civil Works
Works
90 days
Thamaraikulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,860
Yes
Block Development Officer(VP),Panchayat union,KPT
29 Nov 2022
10 Nov 2022
29 Nov 2022
10 Nov 2022
29 Nov 2022
10 Nov 2022
18 Nov 2022
Amount
Part- 1 :-Construction of Kitchen Shed in P.U.M.School @ Thamaraikulam Village & Thulukkankulam panchayat
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Refilling the basement with excavated earth including all labour charges such as watering and ramming etc., complete as per standard specification.
Filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Brick work in CM 1:5 mix using country bricks including all cost and conveyance of materials and labour charges etc., complete.
Supplying and erecting centering shuttering Below GL
Supplying and erecting centering shuttering Above GL
Supplying and fabrication of steel for RCC works including all cost and conveyance and all labour charges such as cutting bending tieing and placing in position etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete
Finishing the top of roof with one course of Pressed Tiles of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight, including all cost and conveyance and all materials on complete
Plastering with CM 1:3 mix using to 10mm thick including all cost and conveyance of all materials and all labour charges etc., complete
Plastering with CM 1:5 mix using to 12mm thick including all cost and conveyance of all materials and all labour charges etc., complete
Granolithic flooring finishing with CC 1:2:4 mix using 10mm - 12mm ISS chips HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Distempering two coats using best quality and approved colour of oil bound distemper over one coat of cement paint primer including all cost and conveyance of materials, labour charges etc., complete.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
a)Door (1.00x2.10)
b)Door D1 (0.90x2.10)
c)Window (1.20x1.20)
e)Window with openable grills (1.20x1.20)
Labour charges for fixing steel Doors
Labour charges for fixing steel Windows & Ventilators
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board etc., complete.
Light Point SD 17
Tube Light SD 87
Service Runoff SD64
EB Deposit
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.KARUPPASAMY
stage.html
html • 0.02 MB
finance_310716.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .