Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.0 CrAdmitted-Finance JHARSUGUDA UNDER STATE PLAN | JHARSUGUDA | ODISHA | 768201 | -15.09% | ₹16.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹16.9 Cr+₹88.1 L (5.50%)Admitted-Finance AT SAMALBHUMI COLONY N H 6 PO DHANKAUDA DIST SAMBALPUR 768006 | SAMBALPUR | ODISHA | 768006 | -9.99% | ₹16.9 Cr+₹88.1 L (5.50%) | L2 | Admitted-Finance |
| 3 | L2₹16.9 Cr+₹88.1 L (5.50%)Admitted-Finance | -9.99% | ₹16.9 Cr+₹88.1 L (5.50%) | L2 | Admitted-Finance |
Tender Value
₹18.6 Cr
Closing Date
7 May 2022, 5:00 pmClosed
CCE RW CIRCLE SAMBALPUR
CCE RW CIRCLE SAMBALPUR
T01-NH42 to Beldihi Kadaligarh Road
2022_CERWI_116815_1
OR28320
Open Tender
Civil Works - Roads
Percentage
360 days
Sambalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
OSRRA
Exempted
23 May 2022
18 Apr 2022
9 May 2022
18 Apr 2022
7 May 2022
18 Apr 2022
18 Apr 2022 - 5 May 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.etc. complete and as per direction of the Engineer-in-charge. | 1,46,160 | Sqm | 1.53 | ₹2,23,624.8 |
| 2 | Scarifying Existing Bituminous Surface to a Required Depth by Mechanical Means and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. etc. complete and as per direction of the Engineer-in-charge. | 89,257.5 | Sqm | 6.81 | ₹6,07,843.58 |
| 3Dismantling of existing structures, like culverts bridges, retaining walls and other structures compreising of stone masonry, including unserviceable materials and stacking the serivceable matering with all lift and lead of 1000m as per Technical Specification Clauses 202 and as per direction of the Engineer-in-charge. | |||||
| 3.01 | R.R. stone masonary in cement mortar | 228.24 | Cum | 279.81 | ₹63,863.83 |
| 4Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 and as per direction of the Engineer-in-charge. | |||||
| 4.01 | Cement Concrete | 27.72 | Cum | 432.75 | ₹11,995.83 |
| 5Removing all types of Hume pipes and stacking within a lead of 1000m including earth work and dismantalling of masonary works as per Technical Specification Clause 202. and as per direction of the Engineer-in-charge. | |||||
| 5.01 | Above 600mm to 900mm dia Hume pipe | 30 | Rmt | 268.48 | ₹8,054.4 |
| 6 | Construction of embankment with approved materials deposited at site from road way cutting and excavation from drain & foundation of other strutures graded & compacted to meet the requirement of Tables 300.1 & 300.2 as per clause no.301of MORD specification for Rural roads and as per direction of Engineer-In-Charge. | 10,692.87 | Cum | 28.65 | ₹3,06,350.73 |
| 7 | Excavation of road way in soil with hyudrulic excavatir if 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requiremetns of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m. and lead upto 1000m. as per Technical Specification Clause 302.3 of MORD.and as per the direction of the Engineer-in-charge | 15,078.23 | Cum | 32.88 | ₹4,95,772.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_188073.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .