Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.6 Cr+₹9.8 L (0.93%)Admitted-Finance H NO 122 AMBIKA VIHAR POONCH HOUSE TALAB TILLO JAMMU 180002 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180002 | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 4 | Not Admitted-Fee/PreQual/Technical 50 B SEC A SUBASH NAGAR JAMMU J K 180005 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180005 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.0 Cr
EMD Value
₹23.9 L
Closing Date
9 Sept 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer PWD Pir Panjal, Rajouri
Chief Engineer PWD Pir Panjal, Rajouri
Construction of road from Shaeed Nizam Ud Din Kotli to Neosi via Khor Channa and Channa to Hasote Phase-I length 7.50 kms under NABARD RIDF XXX up to BT status
2025_PWDJK_284823_1
NIT NO 13 OF 2025-26 Dated 21-08-2025
Open Tender
Civil Works
Percentage
545 days
Mahore
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,960
CAO PW RnB Department Pirpanjal
₹23.9 L
Office of Chief Engineer PWD Pir Panjal, Rajouri
30 Oct 2025
21 Aug 2025
10 Sept 2025
21 Aug 2025
9 Sept 2025
21 Aug 2025
25 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying of Granular sub base course(GSB) with Nallah aggegate 60mm Avg including consolidation with 80-100 KN road roller to the required gragient, camber and density including stacking lead,lift carriage complete job | 2,288 | cum | 2,219.15 | ₹50,77,415.2 |
| 2 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in Charge. | 3,093.75 | cum | 1,885.95 | ₹58,34,657.81 |
| 3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | 1,546.88 | cum | 8,734.85 | ₹1,35,11,764.77 |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm | 30,937.5 | Sqm | 75.75 | ₹23,43,515.63 |
| 5 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom. 16.39.2.1 On W.B.M. /W.M.M. @ 0.4 Kg/sqm. | 30,937.5 | Sqm | 31.6 | ₹9,77,625 |
| 6 | 2 cm premix carpet surfacing with 1.8cum and 0.90 cum of stone chippings of 13.2 mm size and 11.2 size respectively, per 100 sqm and 52kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent. | 30,937.5 | Sqm | 221.35 | ₹68,48,015.63 |
| 7 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete | 30,937.5 | Sqm | 102.85 | ₹31,81,921.88 |
| 8 | Strengthening of berm by way of filling (RBM) on both side including compaction | 3,067.27 | cum | 600 | ₹18,40,362 |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:50m from cutting edge. all kinds of soil Abutment, Wings & Approaches | 685.68 | cum | 187.3 | ₹1,28,427.86 |
| 10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:50m from cutting edge. all kinds of soil Abutment, Wings & Approaches | 514.13 | cum | 256.85 | ₹1,32,054.29 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_880618.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .