Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 36 NIRBHAY NAGAR COLONY GELANA ROAD SIKANDRA AGRA UTTAR PRADESH 282007 | AGRA | UTTAR PRADESH | 282007 | Admitted-Finance |
| 2 | Admitted-Finance 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹29.1 L
EMD Value
₹30,000
Closing Date
27 Jul 2020, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Annual Maintenance and Patrolling Of various 220 KV and 132 KV Line Under ETD Hathras
2020_UPTCL_470966_2
ET-10/ETC(M)/20-21
Open Tender
Electrical Works
Lump-sum
365 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD Mathura
₹30,000
5 Aug 2020
21 Jul 2020
28 Jul 2020
21 Jul 2020
27 Jul 2020
21 Jul 2020
120 days
220 KV Lines-
Regular Tower to Tower ground quarterly patrolling of approximate total 120.34 Kms. long following lines of 220 KV detection of defects like missing/theft tower members, hot point, puncture insulator disc, dislocation of vibration dampers/damaged conductor/earthwire, checking of foundation & position of tree in the corridor of the line, patrolling shall be done on quarterly basis i.e. 04 times in a year. (120.34x4 = 481.36 Km.)
(A) 220 KV Agra (400 KV)-Meetai Line (37.179 Km.)
(B) 220 KV Meetai-Khair Line (62.05 Km.)
(C) 220 KV Meetai-Gokul Line upto LILO point tower no. 68 (21.106 Km.)
Tower top patrolling of line of faulty section to ascertain the faults like polluted insulators, defective insulators & fitting & red hot jumpers and tightening of jumpers.
(A) 220 KV Agra (400 KV)-Meetai Line
(B) 220 KV Meetai-Khair Line
(C) 220 KV Meetai-Gokul Line upto LILO point tower no. 68 (21.106 Km.)
Submission of separate patrolling report for each line on prescribed computerised performa In triplicate (1 Set) after each patrolling dully signed by contractor with In 15 days after completion of patrolling.
Lopping, chopping and cutting of trees branches above 0.5 meter grith in the corridor (35 meter for 220 KV lines) line and stacking of above cuttings at proper place far from the line.
Clearing of bird nest, kites their string and all other related things from the tower.
Emergency patrolling of above line during tripping to detect the exact fault location & type of fault or as per direction of engineer in charge.
Fabrication & fixing of tower members including cartage of steel angles from S/S store, punching holes for proper placement, tightening of nuts & bolts punching & chamfering at different tower location of above Transmission Line.
Tack welding of new nuts & bolts.
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc and its transportation up to the site.
Repairing of foundation coping, wherever required including cost of material, labour, T&P etc and its transportation up to the site.
(A) Destringing of ACSR Zebra conductor from adjecent towers for making mid span compression joint, that were found unhealthy in thermo scanning work include dismantling of tension tower string, opening/loosing conductor from suspension string, fixing rollers at suspension towers and providing stay at Tension Tower if required.
(B) Replacement of Mid Span Joint that were found unhealthy in thermoscanning by cutting old joint and fitting new joint/joints with the help of compression machine by adding aditional ACSR conductor if ncecessary. MSC Joint and conductor shall be supplied by the department free of costand all other material, T&P shall be supplied by contractor at his own cost.
(C) Stringing of ACSR Zebra conductor with the help of puller after making MSC joint . Work include replacement of damaged string/discs or fittings if required and all other works required to do the work satisfactory.
Strengthening/replacement of damaged jumpers at tension tower or connecting back jumper in case of jumper faliure.
Replacement of damaged/punctured insulators string/disc and fixing new string/disc where required at different tower location including cartage of material from store to work site of the above line. All the manpower and T&P shall be provided by contractor. (Except river tower)
(A) Suspension String
(B) Tension String
Tightening/fixing of missing/displaced vibration dampers /arcing horn.
Strengthening of earthwire including replacement/ tightening of suspension clamp/copper bond/bull dog clamp as per site requirement.
Clearing of accumulated soil around tower legs above chimney, painting of tower legs of 300 mm above chimney of each leg by black rubber seal paint of standard quality to maintain the strength of leg by restricting the rusting of legs due to accumulation of soil and water lodging during rainy season.
132 KV Lines-
Regular Tower to Tower ground quarterly patrolling of approximate total 222.52 Kms. long following lines of 132 KV detection of defects like missing/theft tower members, hot point, puncture insulator disc, dislocation of vibration dampers/damaged conductor/earthwire, checking of foundation & position of tree in the corridor of the line, patrolling shall be done on quarterly basis i.e. 04 times in a year. (222.52x4 = 890.08 Km.)
(A) 132 KV Meetai-Hathras (Odpura) I line (5.35Km.)
(B) 132 KV Meetai-Hathras (Odpura) II line (11.Km.)
(C) 132 KV Meetai-Sadabad line (18 Km.)
(D) 132 KV Agra (400 KV S/S)-Sadabad line (22 Km.)
(E) 132 KV Meetai-Bamauli line including both circuit of LILO at 132 KV S/S Bamauli (20 Km.)
(F) 132 KV Meetai-Sasni line (26.106 Km.)
(G) 132 KV Bamali LILO tower no. 35 to Mant 132 KV LILO tower no. 98 (21 Km.)
(H) 132 KV Bamauli-Mant (132 KV) LILO at 220 KV S/S Mant (Only LILO Section both circuit) - (54.70 Km.)
(I) 132KV D/C Meetai-DFCCIL (Ubeti) (30.70 km)
(J) 132 KV Odpura-Sasni Line (13.66 Km.)
Tower top patrolling of line of faulty section to ascertain the faults like polluted insulators, defective insulators & fitting & red hot jumpers and tightening of jumpers.
(A) 132 KV Meetai-Hathras (Odpura) I line (5.35Km.)
(B) 132 KV Meetai-Hathras (Odpura) II line (11.Km.)
(C) 132 KV Meetai-Sadabad line (18 Km.)
(D) 132 KV Agra (400 KV S/S)-Sadabad line (22 Km.)
(E) 132 KV Meetai-Bamauli line including both circuit of LILO at 132 KV S/S Bamauli (20 Km.)
(F) 132 KV Meetai-Sasni line (26.106 Km.)
(G) 132 KV Bamali LILO tower no. 35 to Mant 132 KV LILO tower no. 98 (21 Km.)
(H) 132 KV Bamauli-Mant (132 KV) LILO at 220 KV S/S Mant (Only LILO Section both circuit) - (54.70 Km.)
(I) 132KV D/C Meetai-DFCCIL (Ubeti) (30.70 km)
(J) 132 KV Odpura-Sasni Line (13.66 Km.)
Submission of separate patrolling report for each line (Total 10 lines) on prescribed computerised performa In triplicate (1 Set) after each patrolling dully signed by contractor with In 15 days after completion of patrolling.
Lopping, chopping and cutting of trees branches above 0.5 meter grith in the corridor (27 meter for 132 KV lines) line and stacking of above cuttings at proper place far from the line.
Clearing of bird nest, kites their string and all other related things from the tower.
Emergency patrolling of line during tripping to detect the exact fault location & type of fault or as per direction of engineer in charge.
Fabrication & fixing of tower members including cartage of steel angles from S/S store, punching holes for proper placement, tightening of nuts & bolts punching & chamfering at different tower location of above Transmission Line.
Tack welding of new nuts & bolts.
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc and its transportation up to the site.
Repairing of foundation coping, wherever required including cost of material, labour, T&P etc and its transportation up to the site.
Destringing of ACSR Panther conductor from adjecent towers for making mid span compression joint, that were found unhealthy in thermo scanning work include dismantling of tension tower string, opening/loosing conductor from suspension string, fixing rollers at suspension towers and providing stay at Tension Tower if required.
Replacement of Mid Span Joint that were found unhealthy in thermoscanning by cutting old joint and fitting new joint/joints with the help of compression machine by adding aditional ACSR conductor if ncecessary. MSC Joint and conductor shall be supplied by the department free of costand all other material, T&P shall be supplied by contractor at his own cost.
Stringing of ACSR Panther conductor with the help of puller after making MSC joint . Work include replacement of damaged string/discs or fittings if required and all other works required to do the work satisfactory.
Strengthening/replacement of damaged jumpers at tension tower or connecting back jumper in case of jumper faliure.
Replacement of damaged/punctured insulators string/disc and fixing new string/disc where required at different tower location including cartage of material from store to work site of the above line. All the manpower and T&P shall be provided by contractor. (Except river tower)
(A Suspension String
(B) Tension String
Tightening/fixing of missing/displaced vibration dampers /arcing horn.
Strengthening of earthwire including replacement/ tightening of suspension clamp/copper bond/bull dog clamp as per site requirement.
Clearing of accumulated soil around tower legs above chimney, painting of tower legs of 300 mm above chimney of each leg by black rubber seal paint of standard quality to maintain the strength of leg by restricting the rusting of legs due to accumulation of soil and water lodging during rainy season.
S.S. TRANSMISSION AND CONSTRUCTION COMPANY
YASHRAJ CONSTRUCTION PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .