Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAdmitted-Finance 691 INDUSTRIAL AREA PHASE II CHANDIGARH 160 002 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160002 | L1 | Admitted-Finance | |
| 2 | L2₹35.4 L+₹1.4 L (4.13%)Admitted-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | L2 | Admitted-Finance | |
| 3 | L3₹38.6 L+₹4.6 L (13.7%)Admitted-Finance SECTOR 10 PANCHKULA | PANCHKULA | PANCHKULA | HARYANA | L3 | Admitted-Finance | |
| 4 | L4₹49.5 L+₹15.5 L (45.6%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹50.3 L+₹16.4 L (48.2%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SATTYAM BUILDERS L5 | PARTAP ENGINEERING WORKS L1 | M/s Friends Engineering Works L3 | GS Engineers L2 | JD ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking up or down existing steel water tubing & connections including all fittings for 15 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 40 | RUNNING METRE | 30 ₹1,200 | 5 ₹200 Lowest | 30 ₹1,200 | 10 ₹400 | 25 ₹1,000 |
| 2.00 | Taking up or down existing steel water tubing & connections including all fittings for 20 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 440 | RUNNING METRE | 40 ₹17,600 | 5 ₹2,200 Lowest | 30 ₹13,200 | 10 ₹4,400 | 30 ₹13,200 |
| 3.00 | Taking up or down existing steel water tubing & connections including all fittings for 25 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 310 | RUNNING METRE | 50 ₹15,500 | 5 ₹1,550 Lowest | 30 ₹9,300 | 10 ₹3,100 | 40 ₹12,400 |
| 4.00 | Taking up or down existing steel water tubing & connections including all fittings for 40 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 190 | RUNNING METRE | 50 ₹9,500 | 10 ₹1,900 Lowest | 35 ₹6,650 | 15 ₹2,850 | 45 ₹8,550 |
| 5.00 | Taking up or down existing steel water tubing & connections including all fittings for 50 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 390 | RUNNING METRE | 50 ₹19,500 | 10 ₹3,900 Lowest | 35 ₹13,650 | 15 ₹5,850 | 60 ₹23,400 |
| 6.00 | Taking up or down existing steel water tubing & connections including all fittings for 80 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 80 | RUNNING METRE | 60 ₹4,800 | 10 ₹800 Lowest | 40 ₹3,200 | 15 ₹1,200 | 80 ₹6,400 |
| 7.00 | Taking up or down existing steel water tubing & connections including all fittings for 100 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 70 | RUNNING METRE | 70 ₹4,900 | 10 ₹700 Lowest | 40 ₹2,800 | 20 ₹1,400 | 100 ₹7,000 |
| 8.00 | Taking up or down CI/ DI tubing 80 mm dia/ bore with fittings complete and all specified and directed
Note: Excavation, Removal and returning/ fillling will be measured and paid separately under respective item. | 66 | RUNNING METRE | 70 ₹4,620 | 20 ₹1,320 Lowest | 50 ₹3,300 | 20 ₹1,320 Lowest | 110 ₹7,260 |
| 9.00 | Taking up or down CI/ DI tubing 100 mm dia/ bore with fittings complete and all specified and directed
Note: Excavation, Removal and returning/ fillling will be measured and paid separately under respective item. | 336 | RUNNING METRE | 50 ₹16,800 | 20 ₹6,720 Lowest | 50 ₹16,800 | 20 ₹6,720 Lowest | 185 ₹62,160 |
| 10.00 | Taking up or down CI/ DI tubing 150 mm dia/ bore with fittings complete and all specified and directed
Note: Excavation, Removal and returning/ fillling will be measured and paid separately under respective item. | 316 | RUNNING METRE | 60 ₹18,960 | 30 ₹9,480 | 60 ₹18,960 | 20 ₹6,320 Lowest | 245 ₹77,420 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
17 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE CHANDIGARH
GE CHANDIGARH, HQ N area Chandigarh
REPAIR AND MAINTENANCE OF CI/DI/GI DISTRIBUTION LINE, SLUICE VALVE, VALVE PIT ,PUMPING AND SUPPLY MAIN ,CHLORINATION OF WATER and REPAIR TO CHLORINATION INJECTING PUMP SETS ETC AT K AREA UNDER GE CHANDIGARH.
2026_MES_790232_1
GE/CHD/T-61/2026-27
Open Tender
Civil Works
Item Rate
270 days
CHANDIGARH
Class D Cat a(ii) for bidders enlisted in MES.
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹90,000
Yes
29 Oct 2026
19 Sept 2026
19 Oct 2026
19 Sept 2026
17 Oct 2026
3 Oct 2026
19 Sept 2026 - 26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking up or down existing steel water tubing & connections including all fittings for 15 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 40 | RUNNING METRE | 100 | ₹4,000 |
| 2 | Taking up or down existing steel water tubing & connections including all fittings for 20 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 440 | RUNNING METRE | 100 | ₹44,000 |
| 3 | Taking up or down existing steel water tubing & connections including all fittings for 25 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 310 | RUNNING METRE | 10 | ₹3,100 |
| 4 | Taking up or down existing steel water tubing & connections including all fittings for 40 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 190 | RUNNING METRE | 10 | ₹1,900 |
| 5 | Taking up or down existing steel water tubing & connections including all fittings for 50 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 390 | RUNNING METRE | 10 | ₹3,900 |
| 6 | Taking up or down existing steel water tubing & connections including all fittings for 80 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 80 | RUNNING METRE | 10 | ₹800 |
| 7 | Taking up or down existing steel water tubing & connections including all fittings for 100 mm bore of pipe laying in trenches/ floor or in any position complete all as specified and directed.
Note :- Excavation and earth work measured and paid separately. | 70 | RUNNING METRE | 10 | ₹700 |
| 8 | Taking up or down CI/ DI tubing 80 mm dia/ bore with fittings complete and all specified and directed
Note: Excavation, Removal and returning/ fillling will be measured and paid separately under respective item. | 66 | RUNNING METRE | 10 | ₹660 |
| 9 | Taking up or down CI/ DI tubing 100 mm dia/ bore with fittings complete and all specified and directed
Note: Excavation, Removal and returning/ fillling will be measured and paid separately under respective item. | 336 | RUNNING METRE | 10 | ₹3,360 |
| 10 | Taking up or down CI/ DI tubing 150 mm dia/ bore with fittings complete and all specified and directed
Note: Excavation, Removal and returning/ fillling will be measured and paid separately under respective item. | 316 | RUNNING METRE | 10 | ₹3,160 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
tendercomplete.pdf
Tender Documents • 2.56 MB
BOQ_885860.xls
BOQ • 5.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .