Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 CrAdmitted-Finance BHADOHI | UTTAR PRADESH | 221301 | ₹8.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.9 CrAdmitted-Finance | ₹8.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹9.4 CrAdmitted-Finance | ₹9.4 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Kaiser Construction Engineers and Contractor L3 | M/S Krishna Construction L1 | M/s Astha Associates Engineer and Contractors L2 |
|---|---|---|---|---|---|---|
| 1.00 | E/W in corrceting internal section of Sultanpur Parallel Branch including all type of soil, 30m lead and 1.50m lift with manual compaction and dressing to profile . | 67,218.69 | cum | 48.5 ₹32,60,106.47 | 46.5 ₹31,25,669.09 | 40 ₹26,88,747.6 Lowest |
| 2.00 | Dry earth work in foundation for Toe Wall on channels of discharge above 10 Cumecs including lead upto 30M and lift upto 1.5M and its disposal and back filling. | 3,879.9 | cum | 120 ₹4,65,588 | 111.5 ₹4,32,608.85 | 60 ₹2,32,794 Lowest |
| 3.00 | Making sub grade in linning work including watering compaction and preparation of surface. | 31,949.3 | sqm | 30 ₹9,58,479 | 18.5 ₹5,91,062.05 | 10 ₹3,19,493 Lowest |
| 4.00 | Supply & Laying of Geo textile (sheet) made of 200 GSM Woven multifilament polyprophylene yarn including all cost of material, labour and T&P etc. | 33,386.3 | sqm | 145 ₹48,41,013.5 | 126.5 ₹42,23,366.95 | 80 ₹26,70,904 Lowest |
| 5.00 | Supplying and pitching of stone boulder for Side Slope from Mirzapur quarry 20 kg to 40 kg including all cost of material, labour and T&P etc. | 14,377.18 | cum | 4,480 ₹6,44,09,766.4 | 4,140 ₹5,95,21,525.2 Lowest | 4,380 ₹6,29,72,048.4 |
| 6.00 | Supplying and pitching of stone boulder for toe wall from Mirzapur quarry 20 kg to 40 kg including all cost of material, labour and T&P etc. | 3,879.9 | cum | 4,400 ₹1,70,71,560 | 4,168.3 ₹1,61,72,587.17 Lowest | 4,400 ₹1,70,71,560 |
| 7.00 | Repairing of outlets and Construction of Head wall and Tail wall of Outlet at different chainage of Sultanpur parallel Branch b/w km 30.500 to 55.200. | 48 | No | 69,200 ₹33,21,600 | 64,424.59 ₹30,92,380.32 | 60,000 ₹28,80,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹18.9 L
Closing Date
19 May 2026, 11:00 amClosed
SUPERINTENDING ENGINEER
O/O SE XITH CIRCLE IW AYODHYA
AS PER NIT1 LOT04
2026_UPIDC_1147738_4
01/SE-XI/2026-27
Open Tender
Civil Works
Item Rate
270 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
₹18.9 L
O/O SE XITH CIRCLE IW AYODHYA
20 Aug 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in corrceting internal section of Sultanpur Parallel Branch including all type of soil, 30m lead and 1.50m lift with manual compaction and dressing to profile . | 67,218.69 | cum | - | - |
| 2 | Dry earth work in foundation for Toe Wall on channels of discharge above 10 Cumecs including lead upto 30M and lift upto 1.5M and its disposal and back filling. | 3,879.9 | cum | - | - |
| 3 | Making sub grade in linning work including watering compaction and preparation of surface. | 31,949.3 | sqm | - | - |
| 4 | Supply & Laying of Geo textile (sheet) made of 200 GSM Woven multifilament polyprophylene yarn including all cost of material, labour and T&P etc. | 33,386.3 | sqm | - | - |
| 5 | Supplying and pitching of stone boulder for Side Slope from Mirzapur quarry 20 kg to 40 kg including all cost of material, labour and T&P etc. | 14,377.18 | cum | - | - |
| 6 | Supplying and pitching of stone boulder for toe wall from Mirzapur quarry 20 kg to 40 kg including all cost of material, labour and T&P etc. | 3,879.9 | cum | - | - |
| 7 | Repairing of outlets and Construction of Head wall and Tail wall of Outlet at different chainage of Sultanpur parallel Branch b/w km 30.500 to 55.200. | 48 | No | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2147834.xls
BOQ • 0.34 MB
LOT04DOCUMENT.pdf
Tender Documents • 3.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].