Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NA ROHIT TYAGI BEGUM BRIDGE MEERUT BEGUM BRIDGE BEGUM BRIDGE MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | Admitted-Finance |
| 2 | Admitted-Finance ODISHA | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹97.1 L
EMD Value
₹1.9 L
Closing Date
8 Sept 2022, 5:15 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
P. K. Mohanty,EE,HWD-I,PPA
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Authority, First Floor, Administrative Building, Tele -06722-222020 Mob-9938935675
Extension of Port Perimeter Wall upto Seashore near Hanuman Temple.
2022_MoS_707158_1
CE/HWDI/ACCTS-30/20/390
Open Tender
Civil Works
Works
180 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD.
₹1.9 L
Yes
25 Oct 2022
17 Aug 2022
9 Sept 2022
17 Aug 2022
8 Sept 2022
17 Aug 2022
Amount
Engagement of following machineries for cleaning of over burden earth shifting heavy concrete blocks,broken concrete structure, debrises and for clearing the area or for any other purpose including Port entry fees, hire & running charges, fuel, lubricants, T&P, all taxes, operation expenses etc. all complete excluding GST and as per direction of Engineer in charge. NB: No idle hours shall be paid.
Excavator of 2 cum bucket capacity
Payloader
Supply of all labour of following categories, T&P for shifting of existing cable line, backfilling, levelling and other alied works including Port entry fees, etc. all complete excluding GST and as directed by the Engineer-in-charge.
Skilled Labours.
Semi-Skilled Labours.
Earth work excavation in all kinds of soil from the existing ground level in foundation trenches with initial lead and lifts & levelling, ramming as per requirement etc with disposal of the excavated materials at locations as directed, dewatering etc with supply of all labour, materials, T&P, hire & running charges of all machineries, Port entry fees, all taxes etc all complete excluding GST and as per direction of Engineer in charge.
Dismantling of RCC works by Jack hammer or any suitable method and disposing the same with supply of all labour, engagement, hire & running charges of all equipments, T&P, all taxes, Port entry fees, providing safety arrangements for workmen, cleaning the site, all transportation etc all complete excluding GST and as directed by the Engineer in charge.
Providing cofferdam made out of bituminous drums to protect the working platform from wave action by driving wooden piles of required length and level, 1m spaced vertically & horizontally supported, providing tie arrangements and sand bags to keep the construction in position as per approved drawing and design with supply of all materials, labour, hoisting, placing, conveyance charges, taxes, T&P, removal of all obstructions recountered during work, all leads & lifts including engagement hire & running charges of all machineries,fuel & lubricants with all taxes, T&P, Port entry fees, all safety arrangements etc. all complete excluding GST and as per direction of Engineer in charge.
Providing, fabricating, erecting and Driving to the position M.S. Liners of 6.0mm Thick and required length with M.S. shoes of 1.25m height using 10.0mm thick M.S. plates for 600mm dia bored vertical pile measured from cut off level of pile to the terminating level including supplying, cutting, rolling, bending, handling, welding with cost of labours, materials, accessories, hire and running charges of all machineries, fuel & lubricants, consumables, T&P, conveyance charges, Port entry fees etc. all complete excluding GST and as per drawings & specification as directed by Engineer in charge.
Boring through all types of soils, boulders, hard starta & rocks etc. by percussion drilling using Direct Mud Circulation (DMC) for 600mm Dia vertical bored cast-in-situ piles from existing ground level (+) 4.00m to the founding level (-)8.00m Chart Datum of the piles including chiselling, bailing, flushing the bore with bentonite solution of required density, shifting of materials, installation of mechanical winch and power unit, removal of excavated earth with all leads & lifts,mobilisation,de-mobilisation etc. complete excluding GST and as directed by the Engineer in charge.
Supplying, Fabricating and placing steel reinforcement TMT bars (Fe-500D) confirming to IS 1786 for all reinforced cement concrete pile in position including lifting hook, cutting, bending, tying with 16 gauge G.I. binding wire and welding to proper specifications wherever required including cost of steel and binding wire, consumables, machineries, lifting crane,fuel & lubricants, cover blocks of 100mm dia in CC M-40 mix with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees etc. all complete excluding GST and as directed by the Engineer in Charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.
Providing and laying cast-in-situ cement concrete mix M-40 as per standards for 600mm Nominal dia vertical bored castin-situ reinforced cement concrete piles measured from cut off level of the pile upto founding level excluding cost of reinforcements and M.S liners but including mixing, conveying through transit mixer,placing the concrete by tremie pipe of suitable dia,compacting & consolidating with supply of all labour, material, transportation cost, hire and running charges of all machineries,mechanical winch, power unit & acessories, fuel & lubricants, mobilisation,de-mobilisation etc. complete excluding GST and as per approved drawings, standard specifications and as directed by the Engineer-In-Charge.
Chiseling/Breaking the top of the 600mm dia pile concrete by using suitable tools and mechanical equipments up to the receipt of dense concrete and dressing the pile head suitably so as to receive the form work for coping beam including breaking to the required level exposing the pile reinforcement to sufficient length as per approved drawing for embedding into the coping beam etc. including removal of concrete debris from the site and disposing at places by as directed by private trucks, loading & unloading with supply of all labour, T&P, transportation cost, hire and running charges of all machineries complete excluding GST and as directed by the Engineer-In-Charge.
Supplying, mixing, transporting, laying in proper level & grade Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 hard granite graded chips of 20mm & below size Crusher Broken) for PCC including form works made of ply/steel shutters, hoisting, laying over compacted surface, finished smooth to the exposed surface, to proper level & gradient, barricading the work site curing etc with supply of all materials, labour, T&P, all taxes, hire & running charges of all machineries, transportation charges, Port entry fees etc all complete excluding GST and as directed by the Engineer in charge.
Providing and laying reinforced cement concrete in concrete mix M-40 for coping beam (excluding cost of steel reinforcements) and pre-cast slab in concrete work in super structure as per approved drawing including mixing, conveying, laying, consolidating, curing, with supply of all labour, material, transportation cost, hire and running charges of all machineries,port entry fees, fuel & lubricants etc. complete excluding GST and as directed by the Engineer-In-Charge.
Supply of Fe-500D steel confirming to IS 1786 for coping beam including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 16 to 18 gauge with supply of all materials, labour, transportation, T&P, all taxes, tollage, safety measures, port entry fees, etc. all complete excluding GST and as directed by the Engineer-In-Charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.
Collecting, Conveying, Supplying & Spreading of IRC Grade-II metal of approved quality & filling the interstices with required Quarry Dust as per specification, laying over the compacted Gr-I surface to required slope, compacting by VRR including supply of all materials, labour, T&P, transportation charges, hire & running charges of all equipments, water sprinkling, royalties, Taxes, Port entry fees etc. all complete excluding GST and as directed by the Engineer in charge.
Providing fitting and fixing the fabricted MS structures after cutting, bending, making holes, jointing, welding as per requirement and Hoisting fabricated structurals, placing in position as per the drawings or as directed with supply of labour and material,machinery, cost of fuel, electrode, gas, consumables hire and running charges of all kind of equipments, taxes, tollages etc all complete but excluding GST as per direction of Engineer-in-charge.
Supply, transportation of hard broken granite stone of size 60.0kg and above of approved quality from the quarry as per requirement, conveying by private trucks with all leads and lifts including loading at one end and unloading at the other end and stacking manually/ mechanically at site in standard stacks, conveying stones from the stacks near site with all leads and lifts, preparing/leveling/dressing the base to the required profile, placing the stones, proper packing and filling the interstices by using small stones, providing and maintaining all approaches with supply of all labour, materials, conveyance, handling charges, T&P, engagement, hire and running charges of all machineries, fuel & lubricants, all safety arrangements etc. complete excluding GST and as directed by Engineer in Charge.
Providing Rigid and smooth leak proof centering and shuttering for RCC works in slabs including dismantling them after setting with cost of all material, labour, T&P, taxes, tollage, gate entry fees etc all complete excluding GST and as per direction of Engineer in charge
RCC Wall and fins, Column, Precast slab.
SHIV SHAKTI INFRASTRUCTURE
Naresh Chandra Bhatta
M/S.RAMESH CHANDRA MOHANTY
Shubham Hydrotech Engineers Pvt Ltd.
Maa Dakhinakali Enterprisers
Aakar Engineers and Contractors
Kulamani Nayak
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .