Loading…
Loading…
Tender Value
₹15.9 Cr
EMD Value
₹31.7 L
Closing Date
1 Oct 2026, 1:00 pm4d left
Superintending Engineer
Office of The SE 3rd Circle Irrigation Works, Agra
Restoration and demarcation of canal land for the Nandgaon Distributary (from km 0.000 to km 46.800) within the jurisdiction of the Upper Division, Agra Canal, Mathura in district Mathura.
2026_UPIDC_1188428_2
12/SE/2026-27
Open Tender
Civil Works
Item Rate
365 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹31.7 L
Office of The SE 3rd Circle Irrigation Works, Agra
24 Sept 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work. | 24,427.37 | CUM | - | - |
| - | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 25.07 | CUM | - | - |
| - | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge. | 3,598.21 | CUM | - | - |
| - | Providing and laying C.C. 1:2:4 with cement, coarse sand and stone grit (20 mm nominal size) with curing complete i/c cost of form work | 405.91 | CUM | - | - |
| - | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 6,230.17 | CUM | - | - |
| - | Struck Pointing in 1:2 Cement mortor in Brick Masonry including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 9,354.65 | SQM | - | - |
| - | Shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work | 9,542.92 | SQM | - | - |
| - | Providing centering & shuttering for bridge slab, bed block, dirt wall, in Raft foundation and transitions for Reinforcement cement concrete work i/c all cost of labour & T&P etc complete for proper completion of work | 596.98 | SQM | - | - |
| - | Laying of reinforeced cement concrete in M20 A20 (1:1.5:2) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 209.03 | CUM | - | - |
| - | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 49.1 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_2238798.xls
BOQ • 0.34 MB
MathuraNandgaon.pdf
Tender Documents • 2.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .