Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹29.4 L+₹19,809.28 (0.68%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹29.6 L
EMD Value
₹59,140
Closing Date
12 Aug 2026, 4:00 pmClosed
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Construction of Main Gate, Landscape development and Macadamization of Internal Roads of ITI Hajin.
2026_PWDJK_319389_1
NIT NO 39 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
45 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB DIVISION SUMBAL
₹59,140
13 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 561.22 | cum | 600 | ₹3,36,732 |
| 2 | supplying and filling of good earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 187.02 | cum | 650 | ₹1,21,563 |
| 3 | Dismantelling of chainlink fencing of required length, removal of tiles and removal of temporary gate. | 1 | job | 5,000 | ₹5,000 |
| 4 | Earth work excavation in foundation trenches and drains by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 13.61 | cum | 286.35 | ₹3,897.22 |
| 5 | Providing and laying of stone soling (Hand Packed) including ramming, dressing and watering all complete.(Incl. all sorts of carriage) including carriage | 12.5 | cum | 1,000 | ₹12,500 |
| 6 | Providing and laying in position cement concrete of specified grade but excluding the cost of centring and shuttering .All work upto plinth level .1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.85 | cum | 0.9 | ₹2.57 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorsblocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 31.21 | cum | - | - |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,
fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 0.89 | cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 167.29 | sqm | 628.25 | ₹1,05,099.94 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for B) Suspended floors, roofs, landings, balconies and access platforms. | 3.96 | sqm | 718.2 | ₹2,844.07 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_1057804.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .