CWE AF NAGPUR
HQ CWE AF NAGPUR VAYUSENA NAGAR, NAGPUR 440007 MILITARY ENGINEER SERVICES
REPAIR MAINT OF HT DISTRIBUTION SYSTEM, VCBs TRANSFORMER HT PANELS AND CABLES AT AFS AMLA
2026_MES_786609_1
80767/E8
Open Tender
Civil Works
Item Rate
GE AF AMLA
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE AF AMLA
₹80,000
Yes
27 Aug 2026
27 Aug 2026
19 Sept 2026
27 Aug 2026
17 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and Labour for on load filtration of transformer oil by continuous circulation of transformer oil through mechanical filters to achieve the desired dielectric strength of 40-60 KV for one minute at 2.5 mm gap including filtration of new transformer oil required for top up to oil conservator level complete all as specified. Note: (i) Oil samples are to be collected from top and bottom of oil tank and test results to be submitted by the contractor for each sample before and after filtration. (ii) New transformer oil required for top up will be measured & paid separately. | 12,000 | Per Ltr | - | - |
| 2 | Supply and topping up new transformer oil as per IS-335 of dielectric strength 60 KV at 2.5 mm gap in transformers/CTs/PTs/Stabilizer of various capacity installed in various sub stations. Note: (i) New transformer oil in the transformer shall be filled in the transformer only after filtration and dehydration of existing transformer oil. (ii) Transformer oil shall be supplied in sealed barrel with test result and test certificate to be submitted by the contractor. | 1,200 | Per Ltr | - | - |
| 3 | Taking out old/ exhausted silica gel from transformer breather, cleaning of the breather assembly. Supply and filling new silica gel in the breather complete and re-fixing the breather assembly with the transformer complete all as specified and directed. | 12 | Kgs | - | - |
| 4 | Supply and Fix in repairs breather assembly of the transformer of 1 KG capacity, any shape, any dia suitable to fit for existing transformer assembly complete all as specified and directed. Note: Shape/type should be as per existing transformer at site. | 4 | Each | - | - |
| 5 | Supply and Fix in repairs breather assembly of the transformer of 1/2 Kg capacity, any shape, any dia suitable to fit for existing transformer assembly complete all as specified and directed. Note: Shape/type should be as per existing transformer at site. | 6 | Each | - | - |
| 6Material and Labour for disconnecting 11/0.433 KV distribution transformer of follwing capacity by removing overhead conductor/ underground cables and earth strips etc. Installation of transformer after repairs, making all connections, testing and recommissioning to full satisfaction of Engr-in-charge. Taking out the transformer from any substation using suitable capacity crane or by any other method irrespective of type of approach available, loading in vehicle, transportation to workshop for repairs and unloading carefully. Reloading the tranformer after repairs, transportation to site and unloading including placing at given position complete all as specified and directed. Note: (i) All the T&P required for disconnection, connection, loading and unloading including necessary petty items like bolts, nuts etc will be arranged by the contractor and rates for the same deem to be included in the rates quoted. | |||||
| 6.1 | Capacity 315 KVA to 500 KVA | 2 | Each Job | - | - |
| 6.2 | Capacity 100 KVA to 250 KVA | 2 | Each Job | - | - |
| 7Material and Labour for repair to transformer step down 11/0.433 KV indoor/outdoor type of following capacity, after dismantling the transformer carefully, opening the top cover of transformer for inspection /repair, draining out the transformer oil from the housing complete, taking out the core and winding by disconnecting the internal connections, removing the carbon/sludge deposit in transformer housing core, renewal/replacement of u/s rubber bushes and washers , replacement of tap changer and thimbles, replacement of silica gel, replacement of top cover gasket set including pasting with pasting material, replacement of worn out nut and bolts, replacement of unserviceable LT & HT bushes, cutting the burnt out winding and re-winding the same with suitable size of super enamelled copper wire as per existing guage, insulating the winding connection by using fire proof sleeve and fire proof tape, varnishing the coil, keeping the coils in electric oven chamber for 24 hrs to remove the moisture, Painting of complete transformer body from outside and inside, Marking of MES/SM Number etc, replacement of conservator tank glass, re-installing the core and winding inside properly, making the all connection with suitable copper lungs, refilling of dehydrated transformer oil including dehydration, reinstalling the top cover after cleaning and painting of housing, conservator tank, expulsion vent etc, meggering the LT and HT side of the Transformer and testing complete all as specified and directed. Note: Winding wire including labour for making of coils and LT/HT bushes will be measured & paid seperately. Contractor should make necessary arrangement for factory visit before opening of the transformer for repairing work and testing of the transformer after carried out necessary repairs. | |||||
| 7.1 | Capacity 315 KVA to 500 KVA | 2 | Each Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_881510.xls
BOQ • 0.35 MB
PS80767.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .