| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC M/s. Neom Builders has been quoted lowest rate of 0.01 percentage below from the Estimate rate and his rate has been approved. | |
| 2 | L2₹6.8 L+₹4,731 (0.70%)Rejected-Finance | L2 | Rejected-Finance Thiru.Hisham Ali has been quoted lowest rate of 0.70 percentage above from Estimate rate | |
| 3 | Rejected-Technical | - | Rejected-Technical Thiru. Abraham Joseph withdrew the tender. |
| Sl No | Description | Qty | Unit | ABRAHAM JOSEPH | NEOM BUILDERS | HISHAM ALI |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for Open Cutting and depositing on Bank within initial lead of 10mt and initial lift of 2mt in hard stiff clay ,stiff black cotton hard red earth shales murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil except rock etc., complete complying with standard specification.As per SS 20 B TNDSS NO 23&24 VI (S2 ),VII 9,10 | 23 | m3 | 3,726 ₹4,396.68 Lowest | 3,956 ₹4,668.08 | 4,140 ₹4,885.2 |
| 2.00 | Plain Cement Concrete 1:4:8 mix using 40mm Hard Broken Granite Stone (I.S.S ) metal from approved quarry including cost and conveyances of all materials to site and all handling charges at both ends cost of from work labour for mixing concrete trasporting laying curing of concrete and all other tools and plants including other incidencial charges such as bailing out of water ,maintaining protective bunds and coffer dams etc.,complete (for base course to body wall of the culvert and surface drain ) complying with standard specification.TNDSS NO 28 V,VI ( S2 ) V,VI (S5A) VII | 23 | m3 | 1,57,343 ₹1,85,664.74 Lowest | 1,76,709 ₹2,08,516.62 | 1,77,100 ₹2,08,978 |
| 3.00 | Supplying and erecting of centering to sides and soffits including supports and strutting for drainages sides and culverts body wall sides using 90 cm x 60 cm and B.G.10 stiffenend with welded mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over (silver oak joists) of size 10 cm x 6.50 cm spread at about 90 cm etc.,complete complying with standard specification.TNDSS NO ;30 & 86 | 28 | m2 | 10,976 ₹12,951.68 Lowest | 17,528 ₹20,683.04 | 18,200 ₹21,476 |
| 4.00 | Plain cement concrete 1:2:4 mix using 20mm Hard Broken Granite Stone (I.S.S ) metal from approved quarry including cost and conveyances of all materials to site and all handling charges at both ends cost of from work labour for mixing concrete trasporting laying curing of concrete and all other tools and plants including other incidencial charges such as bailing out of water ,maintaining protective bunds and coffer dams etc.,complete complying with standard specification.TNDSS NO ;9 & 28 | 52 | m3 | 4,20,004 ₹4,95,604.72 Lowest | 4,74,916 ₹5,60,400.88 | 4,78,400 ₹5,64,512 |
Tender Value
Refer Docs
EMD Value
₹8,200
Closing Date
25 Aug 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER
Sholur Town Panchayat Office, The Nilgiris - 643005
15th Finance Untied Grant Ist Installment -2025-2026 - Providing Surface Drain and Maintenance of CC Road at Jayanthinagar.
2025_DTP_595304_1
286/2025/A1-6
Open Tender
Civil Works
Works
160 days
Sholur Town Panchayat
15th Finance Untied Grant Ist Installment -2025-2026 - Providing Surface Drain and Maintenance of CC Road at Jayanthinagar.
2 documents required · 2 mandatory
₹0
₹8,200
Yes
8 Sept 2025
20 Aug 2025
25 Aug 2025
20 Aug 2025
25 Aug 2025
20 Aug 2025
20 Aug 2025 - 25 Aug 2025
Earthwork excavation for Open Cutting and depositing on Bank within initial lead of 10mt and initial lift of 2mt in hard stiff clay ,stiff black cotton hard red earth shales murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil except rock etc., complete complying with standard specification.As per SS 20 B TNDSS NO 23&24 VI (S2 ),VII 9,10
Plain Cement Concrete 1:4:8 mix using 40mm Hard Broken Granite Stone (I.S.S ) metal from approved quarry including cost and conveyances of all materials to site and all handling charges at both ends cost of from work labour for mixing concrete trasporting laying curing of concrete and all other tools and plants including other incidencial charges such as bailing out of water ,maintaining protective bunds and coffer dams etc.,complete (for base course to body wall of the culvert and surface drain ) complying with standard specification.TNDSS NO 28 V,VI ( S2 ) V,VI (S5A) VII
Supplying and erecting of centering to sides and soffits including supports and strutting for drainages sides and culverts body wall sides using 90 cm x 60 cm and B.G.10 stiffenend with welded mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over (silver oak joists) of size 10 cm x 6.50 cm spread at about 90 cm etc.,complete complying with standard specification.TNDSS NO ;30 & 86
Plain cement concrete 1:2:4 mix using 20mm Hard Broken Granite Stone (I.S.S ) metal from approved quarry including cost and conveyances of all materials to site and all handling charges at both ends cost of from work labour for mixing concrete trasporting laying curing of concrete and all other tools and plants including other incidencial charges such as bailing out of water ,maintaining protective bunds and coffer dams etc.,complete complying with standard specification.TNDSS NO ;9 & 28
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .