| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 LRejected-AOC | ₹1.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | AR CONSTRUCTIONS L1 | R ARUMUGAM L2 |
|---|---|---|---|---|---|
| 1.01 | Cutting BT Road Surface etc., complete | 3 | m3 | 1,320 ₹3,960 | 900 ₹2,700 |
| 2.01 | Earth work excavation for foundation & depositing on bank with an initial lead of 10m & lift of 2 m for depths in soft disintegrated Rock when required, barricading with safety lamps etc all complete as per standard specification as directed by the Departmental Engineer. (Upto 2.00m) | 36 | m3 | 385 ₹13,860 | 300 ₹10,800 |
| 3.01 | Removing the burst C.I./ D.I pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipeline with sound pipe etc complete. (excluding cost of sound pipe and jointing materials and earth work) and as
directed by the departmental Officers - 250 mm dia Pipe (upto 2m) | 2 | Each | 9,890 ₹19,780 | 13,500 ₹27,000 |
| 4.01 | Dewatering using 3hp to 70hp diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other
incidental charges etc., complete. - Hire charges for Diesel Pump set For 3 HP | 6 | Hrs | 54 ₹324 | 275 ₹1,650 |
| 5.01 | Supplying, Laying and Joining of CI Pipe with socket and spigot ends for LA Class as per IS 1536/2001 etc complete
as directed by Engineer-in-charge - 300mm CI LA Class Pipe - Depth upto 2.00m | 11 | m | 8,520 ₹93,720 | 9,000 ₹99,000 |
| 6.01 | Refilling the trenches with suitable excavated earth available along the alignment after the pipes & specials are laid, jointed & tested in layers & watering, ramming &
consolidation directed by the Engineer-in-Charge. | 36 | m3 | 40 ₹1,440 | 40 ₹1,440 |
| 7.01 | Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance. | 1 | m3 | 38 ₹38 | 100 ₹100 |
| 8.01 | Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer. | 26 | m | 15 ₹390 | 48 ₹1,248 |
| 9.01 | Add GST 18% | 1 | GST | 24,032.16 ₹24,032.16 | 25,908.84 ₹25,908.84 |
Tender Value
₹1.6 L
EMD Value
₹1,588
Closing Date
13 May 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Attending the burst and Replacing the Kalathupottal SPS pumping line in Ayyanar kovil street in ward no 22
2025_MAWS_551491_1
E3/EST- 430/ 24-25
Open Tender
Civil Works
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹1,588
20 Jan 2026
29 Apr 2025
13 May 2025
29 Apr 2025
13 May 2025
29 Apr 2025
Amount
Cutting BT Road Surface etc., complete
Earth work excavation for foundation & depositing on bank with an initial lead of 10m & lift of 2 m for depths in soft disintegrated Rock when required, barricading with safety lamps etc all complete as per standard specification as directed by the Departmental Engineer. (Upto 2.00m)
Removing the burst C.I./ D.I pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipeline with sound pipe etc complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the departmental Officers - 250 mm dia Pipe (upto 2m)
Dewatering using 3hp to 70hp diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. - Hire charges for Diesel Pump set For 3 HP
Supplying, Laying and Joining of CI Pipe with socket and spigot ends for LA Class as per IS 1536/2001 etc complete as directed by Engineer-in-charge - 300mm CI LA Class Pipe - Depth upto 2.00m
Refilling the trenches with suitable excavated earth available along the alignment after the pipes & specials are laid, jointed & tested in layers & watering, ramming & consolidation directed by the Engineer-in-Charge.
Disposal of surplus earth including loading and conveyance within a distance of 5 km (basic cost of earth is zero) including loading charges and Conveyance Charges of 5 kms distance.
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by the Departmental Engineer.
Add GST 18%
R ARUMUGAM (BID ID -1335939)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid