Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹7.0 L
Closing Date
29 Sept 2026, 12:00 pm6d left
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
Janpad Siddharthnagar Me Gram Sabha Susanaha Me 3x5x5 m Span Ke RCC Laghu setu ka Nirman Karya
2026_CEUBZ_1186799_1
5097/4E-NIVIDA-BASTI CIRCLE/2026 DATED-07-09-2026
Open Tender
Civil Works - Bridges
Percentage
180 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹7.0 L
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
29 Sept 2026
17 Sept 2026
29 Sept 2026
17 Sept 2026
29 Sept 2026
17 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5.Complete in all aspects or as per direction of E/I. (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 3,250 | Cum | 81 | ₹2,63,250 |
| 2 | Providing, laying and spreading materials on a prepared sub grade, adding cement @2% by weight to the spread materials manually. mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of cement treatet sub-baseComplete in all aspects or as per direction of E/I. (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 27.8 | Cum | 4,714 | ₹1,31,049.2 |
| 3 | Providing, laying and spreading materials on a prepared sub base, cement @ 4% by weight to the spread materials manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of cement treated base Complete in all aspects or as per direction of E/I. (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).). | 26.8 | Cum | 5,824 | ₹1,56,083.2 |
| 4 | Providing and applying tack coat with BitumenVG10 grade using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & Cleaned with Hydraulic broom as per Technical Specification Clause 503. Complete in all aspects or as per direction of E/I. (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 268.75 | Sqm | 27 | ₹7,256.25 |
| 5 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by manual Bitumen VG [email protected]/10sqm as per MORD Specifications 508 Complete in all aspects or as per direction of E/I. With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | - | Sqm | 274 | - |
| 6 | Providing and laying seal coat by Manual means with Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Bitumen VG [email protected]/10sqmTechnical Specification Clause 510. Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | - | sqm | 99 | - |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.Complete in all aspects or as per direction of E/I . (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 54 | Cum | 71 | ₹3,834 |
| 8 | For Diversion Work
Brick soling with straight over burnt bricks laid flat and dry including preparation of subgrade to prescribed camber and including supply of brick filling joints with local earth spreading a blinding coat of 1cm. (3/8") depth of local earth of P.I. 5 to 7 or sand over the entire surface & including labour, T & P etc. required for proper completion of the work. As per SI No.762 (b) Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 190 | Sqm | 437 | ₹83,030 |
| 9 | For Diversion Work
Supply of hume pipe of 900 mm dia Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 10 | Rm | 3,731 | ₹37,310 |
| 10 | For Diversion Work
Laying of hume pipe of 900 mm dia Complete in all aspects or as per direction of E/I. (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.) | 4 | Nos | 492 | ₹1,968 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_2234060.xls
BOQ • 0.41 MB
1.pdf
Tender Documents • 3.03 MB
50971.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .