| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.5 CrAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹34.9 Cr+₹10.7 Cr (44.0%)Rejected-Finance A M HEIGHTS BUILDING AZAD CHOWK ROAD NEAR CENTRAL NAKA N 6 CIDCO CHHATRAPATI SAMBHAJINAGAR 431001 | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | 431001 | 2 | Rejected-Finance Reject | |
| 3 | 3₹26.1 Cr+₹1.8 Cr (7.45%)Rejected-Finance PLOT NO 1 2 AASHIYANA CO OP SOCIETY N 11 CIDCO CHH SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | 3 | Rejected-Finance Reject | |
| 4 | 4₹35.9 Cr+₹11.6 Cr (47.8%)Rejected-Finance | 4 | Rejected-Finance Reject |
Tender Value
₹29.3 Cr
EMD Value
₹15 L
Closing Date
8 Nov 2022, 6:00 pmClosed
Exe. Engineer, PW Division No.2, Jalna
PWD Premises, Jalna
CONSTRUCTION OF RESIDENTIAL QUARTERS TYPE (I,II,III,IV) FOR 100 BEDDED UPGRADED SUB DISTRICT HOSPITAL (FROM 30 BEDDED) AT GHANSAWANGI
2022_PWR_843432_1
Tender Notice No. 06 of 2022-23
Open Tender
Civil Works - Buildings
Item Rate
730 days
Ghansawangi
AS PER NIT
2 documents required · 2 mandatory
₹3,540
₹15 L
Office of C.E, PW Region, Aurangabad
10 Feb 2023
14 Oct 2022
10 Nov 2022
14 Oct 2022
8 Nov 2022
14 Oct 2022
14 Oct 2022 - 2 Nov 2022
2 Nov 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | WORK PORTION (CIVIL) | - | - | - | - |
| 1Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of50m. and spreading for embankment or stacking as directed. | |||||
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1 | Per Cubic Metre | - | - |
| 3Excavation for foundation in hard murum including removing the excavated material upto distance of50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | |||||
| 4 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | 1 | Per Cubic Metre | - | - |
| 5 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means | 1 | Per Cubic Metre | - | - |
| 6Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layersincluding watering and compacting etc. complete. | |||||
| 7 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 1 | Per Square Metre | - | - |
| 8Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. | |||||
| 9 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per squaremetre of surface area covering ten years guarantee on bond paper. | 1 | Per Square Metre | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1460447.xls
BOQ Document • 0.78 MB
107014589.pdf
Tender Document • 0.04 MB
1GHANQUARTERSB2TENDER.pdf
Tender Document • 5.03 MB
107014592.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .