Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.3 L
EMD Value
₹1.4 L
Closing Date
28 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer
Nagar Nigam Firozabad
Work of planting trees using the Miyawaki method along the edge of the footpath from the power station to the municipal corporation boundary.
2026_DOLBU_1194088_1
14/PWD_Miyawaki/2026-27
Open Tender
Civil Works - Others
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,634
Municipal Corporation
₹1.4 L
7 Oct 2026
7 Oct 2026
28 Oct 2026
7 Oct 2026
28 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 32.62 | Cum | 150 | ₹4,893 |
| 2 | Providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) including supply of all materials, labour and T&P etc. required for completion of work and curing complete. including cost of form work in Foundation and floors. (PWD SOR 2025-26 Chapter No-05 Item No. 273). | 5.44 | Cum | 5,650 | ₹30,736 |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.55 | Cum | 8,000 | ₹60,400 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). | 6.8 | Cum | 8,200 | ₹55,760 |
| 5 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) | 11.26 | Qtl | 6,960 | ₹78,369.6 |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (D.S.R 2023-24 S.No. 10.01). | 4,176.66 | kg | 87.86 | ₹3,66,961.35 |
| 7 | Chain link fabric fencing mesh of size 25x25 mm made of G.I. wire of dia 3 mm (D.S.R 2023-24 S.No. 8696). | 566.25 | Sqm | 322.34 | ₹1,82,525.03 |
| 8 | Applying priming coat over new steel and Painting Ist coat over priming coat on steel and other material………………all complete.(PWD SOR 2025-26, 641new+19.29) . | 566.25 | Sqm | 79 | ₹44,733.75 |
| 9 | Supply and fixing Manak board …………………….. All Complete. | 1 | Nos | 4,635 | ₹4,635 |
| 10 | lhekadu rFkk lajsJ.k | 985 | Sqm | 0.09 | ₹88.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_2253942.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .