Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC ALAMPUR NODAKHALI | ₹10.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.0 LRejected-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹11.0 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹11.1 LRejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | ₹11.1 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | WEST BENGAL ENGINEERING CO. L3 | M/S.S.S.ENTERPRISE L2 | S. P. CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Sub Station
Labour charges for day to day round the clock operation of 2 x 1250 KVA , 11KV/0.433 KV substation, HV and LV panel boards, control panel board including capacitor banks, 110 volt DC trip circuit with maintenance free batteries, battery charger, indoor type 630A, 20KA VCBs, 1600amp ACBs and other allied accessories including sweeping cleaning of sub-station’s switch yard, control room, office room, toilets etc. by engaging electrical supervisor, electrician etc. as per direction of EIC w.e.f. 01-02-2026 to 31-01-2027 | 12 | Months | 63,950 ₹7.7 L | 63,780 ₹7.7 L | 63,545 ₹7.6 L |
| 2.00 | Periodial inspection, thrice in a month, by Electrical supervisor having valid Supervisors' certificate of competency from Directorate of Electricity( Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/Supervisor w.e.f 01-01-2026 to 31-12-2026 Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House & Substation Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e. pumps, motors, valves with actuators, flow/level/pressure instruments,gauges, lightings, waisting arrangements, exhaust fans, HT & LT Panel Boards, Cables, capacitors, Transformer, Battery and Battery charger along with in- house lighting system. | 12 | Months | 12,990 ₹1.6 L | 12,800 ₹1.5 L | 12,400 ₹1.5 L |
| 3.00 | Cleaning of contacts by CRC 226 spray in the HT & LT Panel Board, cleaning of all Terminal Sockets,Coils one in a month along with minor repairing (if required) of the electrical equipments by supplying necessary sundry materials/electro mechanical accessories as required in presence of Electrical Supervisor/ Electrician and to be recorded in the log book with date. | 12 | Months | 2,750 ₹33,000 | 2,700 ₹32,400 | 2,500 ₹30,000 |
| 4.00 | Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, LT & HT breakers, earthing arrangement system including testing of transformer oil by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, once in a year and submission of the test report in duplicate to Department in each case as required and as per direction of EIC. | 1 | Item | 1,49,900 ₹1.5 L | 1,49,200 ₹1.5 L | 1,48,500 ₹1.5 L |
| 5.00 | Add CESS @ 1% | 1 | Item | - | - | - |
Tender Value
Refer Docs
EMD Value
₹22,500
Closing Date
10 Jan 2026, 1:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and maintenance of 11KV/0.433 KV substation at GLR-7 Jaynagar-2 Block of Mega Surface water based water supply scheme for Falta Mathurapur in the District of S 24 pgs under SMD PHE Dte
2025_PHED_968580_8
WBPHE/EE/SMD/NIeT-53 of 2025-26
Open Tender
Electrical Work/ Equipment
365 days
GLR-7 Jaynagar-II Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹22,500
16 Mar 2026
15 Dec 2025
12 Jan 2026
15 Dec 2025
10 Jan 2026
15 Dec 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid