Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | L1 | Accepted-AOC Accepted as L-1 bidder basis in OPEN TENDER ENQUIRY | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected as not L-1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected as not L-1 |
Tender Value
₹3.1 L
EMD Value
₹3,900
Closing Date
17 Jan 2025, 11:00 amClosed
GENERAL MANAGER (EXCAVATION)
OFFICE OF GM(EXCV) NIGAHI PROJECT , NCL , PO-NIGAHI , DISTRICT-SINGRAULI , MADHYA PRADESH
Demounting, repairing, rebuilding and mounting of Bucket assembly, H-Link and Arm Links and Co-axial Line boring of Short Arm housing holes, Bucket housing holes and Links assembly holes in Tata Hitachi EX350 Hydraulic Excavator at Auxiliary Section
2024_NCL_324226_1
NGH/EXCV/TENDERS/24-25/165
Open Tender
Excavation Department Work
Item Rate
10 days
NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹3,900
22 Apr 2025
31 Dec 2024
18 Jan 2025
31 Dec 2024
17 Jan 2025
1 Jan 2025
31 Dec 2024 - 11 Jan 2025
Amount
Name and scope of work : Demounting, repairing, rebuilding and mounting of Bucket assembly, H-Link and Arm Links and Co-axial Line boring of Short Arm housing holes, Bucket housing holes and Links assembly holes in Tata Hitachi EX350 Hydraulic Excavator at Auxiliary Section, OWS Nigahi having scope of work as follows- 1) Demounting , repairing , rebuilding and mounting of Bucket assembly , H-Link and 2 nos. Short Arm Links 2) Reclamation and co-axial line boring work of bucket housing holes(4 nos) 3) Reclamation and co-axial line boring work of Link assembly holes(4 nos) 4) Reclamation and co-axial line boring work of Short arm assembly holes(2 nos) 5) Straightening H-Link and 2 nos. Arm Links by Press machine Note- Welding electrodes and Indistrial Gases as per requirement will be provided departmentally. Maximum likely manpower to be deployed per shift : 6 no ( Skilled-04 no , Semiskilled- 02 no )
Cost/ charges for Demounting , repairing , rebuilding and mounting of Bucket assembly , H-Link and 2 nos. Short Arm Links including labour charges, contractor profit etc. (labour consisting of skilled fitter , skilled welder, semiskilled helper manpower)
Cost/ charges for Reclamation and co-axial line boring work of bucket housing holes(4 nos) ( 172.7 CuCm x 4 nos.)
Cost/ charges forReclamation and co-axial line boring work of Link assembly holes(4 nos) ( 410 CuCm x 4 nos.)
Cost/ charges for Reclamation and co-axial line boring work of Short arm assembly holes (2 nos) ( 612 CuCm x 2 nos.)
Cost/ charges for Straightening H-Link and 2 nos. Arm Links by Press machine including labour charges, contractor profit etc. (labour consisting of skilled fitter , skilled welder, semiskilled helper manpower)
Cost/ charges for Press machine with all accessories for Straightening H-Link and 2 nos. Arm Links
Cost/ charges for Hiring of Griding machines with all accessories for all the above jobs
Cost/ charges for Hiring of welding machines with all accessories for all the above jobs
Total impact of GST for the purpose of CTC
MEENA ENGINEERING (BID ID -1116595)
M/S SHIVA NAND (BID ID -1116644)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .