| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Quoted amount is less than others, hence accepted. |
| 2 | L2₹4.3 L+₹8,925.96 (2.13%)Rejected-Finance | ₹4.3 L+₹8,925.96 (2.13%) | L2 | Rejected-Finance Quoted amount is more than others, hence rejected. |
| 3 | L3₹4.4 L+₹18,857.66 (4.50%)Rejected-Finance | ₹4.4 L+₹18,857.66 (4.50%) | L3 | Rejected-Finance Quoted amount is more than others, hence rejected. |
Tender Value
₹4.2 L
EMD Value
₹4,191
Closing Date
24 Jul 2026, 6:55 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT SAMITI PARBHANI
Construction of C.C.Road at, TAKLI KU. Tq.PARBHANI, Dist.Parbhani (Under Thakkar Bappa Adivasi Vasti Sudhar Yojana, 2025-26)
2026_PARBH_1319149_1
PSPARBHANI/E-T/2025-26/02
Open Tender
Civil Works
Percentage
180 days
PANCHAYAT SAMITI PARBHANI
Refer Tender Document
3 documents required · 3 mandatory
₹1,600
₹4,191
29 Jul 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying trap/granite/quartzite/gnesiss stone over size metal of requred size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders/Rubble and stacking broken metal etc.complete. (Prior approval of sample stack of broken metal by the ex engineer in necessary the date of approval will from part of the measuement) a) 80 mm metal, By breacking rubble obtained by blasting.Complete.SSR Item No.50.55 & Page no.24 | 25.17 | Cum | 1,228.32 | ₹30,916.81 |
| 2 | Supplying hard murum/kankar at the road side including conveying and stacking etc. as directed by Engineer in charge | 8.39 | Cum | 687.22 | ₹5,765.78 |
| 3 | Supplying trap/granite/quartzite/gnesiss stone over size metal of requred size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders/Rubble and stacking broken metal etc.complete. (Prior approval of sample stack of broken metal by the ex engineer in necessary the date of approval will from part of the measuement) a) 40 mm metal, By breacking rubble obtained by blasting.Complete.SSR Item No.50.55 & Page no.24 | - | Cum | 1,299.98 | - |
| 4 | Supplying soft murum at the road side including conveying and stacking etc. as directed by Engineer in charge | 8.39 | Cum | 684.22 | ₹5,740.61 |
| 5 | Spreading 80/40 mm metal including sectioning etc.complete as directed by Engineer in charge | 50.34 | Cum | 85 | ₹4,278.9 |
| 6 | Spreading hard murum / soft murum/ gravel or kankar for side width complete. | 16.78 | Cum | 79 | ₹1,325.62 |
| 7 | Compacting the sub grade gravel / oversize metal (200 mm loose) layers for all wide with power roller having weight 8 to 10 MT inlcuding nrcessary lavbour materials and artificial watering complete. | 251.7 | Sqm | 27 | ₹6,795.9 |
| 8 | Compacting the sub grade gravel / oversize metal (100 mm loose) layers for all wide with power roller having weight 8 to 10 MT inlcuding nrcessary lavbour materials and artificial watering complete. | 251.7 | Sqm | 25 | ₹6,292.5 |
| 9 | Provding and cast in situ/Ready Mix cement concrete in M-10/ of trap/ granite/ quartzite/ gneiss metal for foundation and bedding inlcuding bailling out water,steel centering formwork,laying /pumping, Compacting. Roughening them if special finishis to be provided. finishing if required and curing complete. with fully automatic micro processor based PLC with SCADA enabled reversible Drum type mixer/concrete Batch mix plant (Pan Mixer)etc.complete. | 25.17 | Cum | 6,384.73 | ₹1,60,703.65 |
| 10 | Provding and cast in situ/Ready Mix cement concrete in M-15 / of trap/ granite/ quartzite/ gneiss metal for Bed Blocks, foundation blocks and such other items inlcuding bailling out water,steel centering formwork,laying /pumping, Compacting. Roughening them if special finishn is to be provided. finishing uneven and honeycombed surface and curing etc.complete The cement motor 1:3 plaster is consider for rendering uneven and honeycombed surface inly Newly laid concrete shall be convered by gunny bag, plastic,tarpaulin etc.(with fully automatic micro processor based PLC with SCADA enabled reversible Drum type mixer/concrete Batch mix plant (Pan Mixer)etc.complete.with fine aggregate (Crushed sand VSI Grade) SSR Item No.24.01 | 18.88 | Cum | 6,893.14 | ₹1,30,142.48 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
BOQ_2260820.xls
BOQ • 0.33 MB
DetailedNIT.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .