Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC C O VOLTAS LIMITED SPARE PARTS DEPOT OLD HUTMENT COLONY NCL NIGAHI SINGRAULI M P 486884 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486884 | ₹1.6 L | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 BIDDER DUE TO NOT L1 BIDDER |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | Universal MEP Projects & Engineering Services Limited L1 | ALISON INDIA L2 |
|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc.: 1. Periodical/Scheduled Inspection and Maintenance: A. To carry out periodic / scheduled inspection and maintenance of entire system as per the check sheet and OEM /OES/OPM recommendations. B. Attend and rectify major breakdown / repair if any within 24 hours of complaint. C. Assist in planning of spares for maintenance and repair to be procured and provided by project / NCL. 2. Details of Work: - This includes: A. Periodic/Scheduled Inspection and Maintenance. Thorough inspection of AC system performance by team consisting of one system specialist with a technician in line with the check sheet in each equipment, three times in a month. B. Refrigerant & compressor oil filling. This includes: a. Leakage test with nitrogen at every joint by means of applying soap solution. b. Vacuum formation in the system by means of vacuum pump. c. Refrigerant charging with the adjustment of high and low pressure cut-offs. d. Compressor oil filling as per requirement of System. e. Ensuring proper cooling of the operator cabin. In addition to this, refrigerant top up will be taken care for proper cooling of the operator cabin. 3. If the machine remains breakdown for a complete month, no payment shall be made for that machine in that particular month. | |||||
| 2.00 | Charges of Annual Maintenance Contract for air conditioner fitted in P&H- 1900AL, Sl. No. 3 Shovel of Khadia Project including Periodical /Scheduled Inspection and Maintenance inclusive of manpower, tools & tackles, refrigerant and its charging and compressor oil and its filling for the period of 365 days including contractor's profit.
Note: It includes a group of 01 No. Highly Skilled, 01 No. Skilled and 01 No. Semi-Skilled Manpower 03 times in a month for a period of 01 year (12 months) i.e. 12 X 3 = 36 times in a year. | 36 | Nos. | 2,000 ₹72,000 Lowest | 3,260 ₹1,17,360 |
| 3.00 | Transportation Charges
Note: 03 times in a month for a period of 01 year (12 months) i.e. 12 X 3 = 36 times in a year. | 36 | Nos. | 1,650 ₹59,400 | 1,000 ₹36,000 Lowest |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | Nos. | - | - |
Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
11 Jul 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U. P.-231222
Annual Maintenance Contract for air conditioner fitted in P and H- 1900AL, Sl. No. 3 Shovel of Khadia Project for a period of 365 days.
2025_NCL_338187_1
KHD/G.M. (Excv)/E-Tender/25-26/356
Open Tender
Excavation Department Work
Item Rate
365 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
3 Nov 2025
23 Jun 2025
12 Jul 2025
23 Jun 2025
11 Jul 2025
24 Jun 2025
23 Jun 2025 - 1 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_350577.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .