| 1 | L1₹6.7 LAccepted-AOC OPPOSITE TO TNEB MOOLACHEL THUCKALAY POST THUCKALAY 629175 | THUCKALAY | KANYAKUMARI | TAMIL NADU | 629175 | L1 | Accepted-AOC L1 tendrer |
Tender Value
₹7.0 L
EMD Value
₹6,970
Closing Date
5 Oct 2020, 2:00 pmClosed
Superintending Engineer
KKEDC Nagercoil
UDAY Scheme works for providing 11KV link line for proposed 11 KV Reetapuram feeder upto Sevilai AB switch with ACSR 7/4.09 conductor under Chemponvilai Section of Thuckalay Division
2020_EB_180358_1
KKEDC/UDAY/ETW-27/20-21 DT.17.09.20
Open Tender
Electrical Works
Item Rate
90 days
O/o Superintending Engineer
As specified in tender
3 documents required · 3 mandatory
₹0
₹6,970
17 Mar 2021
18 Sept 2020
6 Oct 2020
19 Sept 2020
5 Oct 2020
19 Sept 2020
19 Sept 2020 - 3 Oct 2020
Civil works
Loading & Unloading of 9 m PSC Pole
Transporting of 9m PSC pole upto 2km from roadside to pole pit by handcart.
Excavation & Erection of 9 m PSC pole on rocky ground
Loading & Unloading of 42' RSJ Pole
Transporting of RSJ pole from roadside to pole pit by handcart.
Excavation & Erection of 42' RSJ pole on rocky ground
Fixing of line insulator ( 1 Loc -3 nos)
Erection of V cross arm 3.5'
Erection of single phase cross arm
Erection of three phase cross arm
Labour charges for guarding including of X arm labour etc , flat guarding 2 wire
Tree branch clearance ( per head / day)
Providing holes on V crossarm & L-clamp ,Line materials etc
Stringing of ACSR 7 / 4.09 conductor
Transporting of materials from section office to workspot by handcart.
Dismantling of three phase cross arm
Dismantling of single phase cross arm
Dismantling and redoing of single phase SC wire
Dismantling and redoing of 7/3.35 conductor(HT)
Dismantling and redoing of 7/2.59 conductor(LT)
Dismantling and redoing of Three phase SC wire
Earthing of HT pole
Dismantling of poles without congrete in damaged condition inlcuding grill seperation etc
Dismantling and redoing of street light fitting
Dismantling and Refixing of streetlight meter box with meter
Alteration of clamps
Conversion of HT Pin Point to HT cut point
Erection of stay set complete as per TNEB Standard
Concreting of Stay (0.3m*0.3m*1.5m) including Materials and cement
Concreting of 9mtr PSC pole and RSJ pole as per board Standard (2*2*5)the material such as sand , jelly etc have to be supplied by the contractor including cement . (Cement concrete mix 1:4:8) using 40 mm hard broken stone including cost for labour charges for placeing transporting of sand , jelly from box and water curring for 14 days etc.
Copying of Pole (0.6*0.6*0.35m) including material Cost
Numbering of poles with yellow colour letter 8 cm dia black back ground or 12 cm including paint , brush etc complete
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .