Loading…
Loading…
Tender Value
₹35.1 L
EMD Value
₹35,200
Closing Date
28 Aug 2026, 5:30 pm5d left
SEMID KHORDHA
O/O SEMID KHORDHA
Improvement to Hada Diversion Wier in Bologarh Block of Khordha District under Impt. to Diversion Wier scheme for the year 2026-27
2026_CEMIB_138984_6
TCN09/26-27
Open Tender
Civil Works - Others
Percentage
120 days
SEMID KHORDHA
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹35,200
Yes
19 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles and uprooting stumps below 1Mtr. girth etc. complete as directed by the Engineer-in-Charge. | - | One Square Meter | 1 | - |
| 2 | Excavation,loading,unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 Cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1.00 km from the place of excavation complete. | - | One Cubic Meter | - | - |
| 3 | Filling in F&P with coarse sand , watered and rammed all complete. | - | One Cubic Meter | 1,174 | - |
| 4 | Cement Concrete M 15 grade using 20mm and downgraded c.b.h.g. coarse aggt complete. | 1 | One Cubic Meter | - | - |
| 5 | R.C.C. work of M-20 grade using 20 mm and down grade crusher broken hard black granite chips Quarried and free from weathered skin of approved quality mixing by concrete mixer including hoisting, lowering and laying concrete in position to proper slope and level and compacting by vibrator in layers not exceeding 0.15m in depth finishing the exposed surface smooth including watering, curing for required period including cost, conveyance, royalty and other taxes of all materials, labour, T&P required all complete as directed by the Engineer-in-charge. | 1 | One Cubic Meter | 1 | ₹1 |
| 6 | Supplying,straightening,cutting, bending, binding and tying the grills and and placing in position for fabrication and fixing of reinforcement including lapping where necessary including cost, conveyance and all taxes of reinforcement steel bars, binding wire with all leads,lifts, coneyance from bending yard to placement spot complete in all respect as directed by the Engineer-in-charge. | - | One Qntl | - | - |
| 7 | Providing and removing rigid smooth centring and shuttering for Concrete work … complete in all respect . (in F&P) | 1 | One Square Meter | - | - |
| 8 | Filling with excavated earth including watering and ramming complete . | 1 | One Cubic Meter | - | - |
| 9 | Gravel backing to revetment. | - | One Cubic Meter | 1 | - |
| 10 | Laterite Stone Packng(Labour Only) | - | One Cubic Meter | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_606404.xls
BOQ • 0.27 MB
09DTCN_2026-27.pdf
Tender Documents • 8.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].