Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance AT PO LAIYO DIST RAMGARH JHARKHAND PIN 825325 | LAIYO | RAMGARH | JHARKHAND | 825325 | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 LAdmitted-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹5.3 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical BHANDANI NAGAR BHURKUNDA RAMGARH JHARKHAND 829105 | BHURKUNDA | RAMGARH | JHARKHAND | 829105 | - | - | Rejected-Technical Technically not acceptable |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not acceptable |
| Sl No | Description | Qty | Unit | Rajneesh Electricals L2 | M/S S. Z. Brothers & Company L1 |
|---|---|---|---|---|---|
| 1.00 | Laying and erection of GI/MS pipes 150mm dia (16 pipes) | 96 | Mtr | 235 ₹22,560 | 224 ₹21,504 |
| 2.00 | Dismantaling old CI/GI pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site lead up to 50 meters:150 mm dia (25 pipes) | 150 | Mtr | 255 ₹38,250 | 241.9 ₹36,285 |
| 3.00 | Providing jointing of GI pipe including cost of nut and bolts and testing of 150 mm dia pipe (16+5) | 21 | No | 285 ₹5,985 | 270.9 ₹5,688.90 |
| 4.00 | Supply and fixing of NR valve 6" | 1 | No | 34,000 ₹34,000 | 32,777.08 ₹32,777.08 |
| 5.00 | Supply and fixing of Foot valve 6" pipe (heavy duty) | 1 | No | 29,000 ₹29,000 | 27,493.24 ₹27,493.24 |
| 6.00 | Adjustment of the required delivery lines due to rising water levels and shifting of 01 pump motor set | 90 | Days | 4,400 ₹4.0 L | 4,194 ₹3.8 L |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹5.9 L
EMD Value
₹7,300
Closing Date
15 Apr 2026, 11:00 amClosed
SO(EnM)
GM OFFICE CHARHI
Dismantling of 25 lengths of 6-inch pipeline from Reddy sump and re-laying 16 lengths of the same 6-inch pipeline on the other side of the same sump for connection to the 3rd range, including adjustment of the required delivery lines due to rising wa
2026_CCL_358004_1
GM(H)/EnM/Tender/MAP/26-27/08
Open Tender
Electrical and Maintenance Works
90 days
JOCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,300
8 May 2026
4 Apr 2026
16 Apr 2026
5 Apr 2026
15 Apr 2026
5 Apr 2026
5 Apr 2026 - 9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying and erection of GI/MS pipes 150mm dia (16 pipes) | 96 | Mtr | - | - |
| 2 | Dismantaling old CI/GI pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes at site lead up to 50 meters:150 mm dia (25 pipes) | 150 | Mtr | - | - |
| 3 | Providing jointing of GI pipe including cost of nut and bolts and testing of 150 mm dia pipe (16+5) | 21 | No | - | - |
| 4 | Supply and fixing of NR valve 6" | 1 | No | - | - |
| 5 | Supply and fixing of Foot valve 6" pipe (heavy duty) | 1 | No | - | - |
| 6 | Adjustment of the required delivery lines due to rising water levels and shifting of 01 pump motor set | 90 | Days | - | - |
| 7 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.40 MB
BOQ_370899.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid