Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.6 L+₹39,865 (12.4%)Rejected-Finance | ₹3.6 L+₹39,865 (12.4%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.7 L+₹46,880 (14.6%)Rejected-Finance | ₹3.7 L+₹46,880 (14.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.0 L+₹80,690 (25.2%)Rejected-Finance | ₹4.0 L+₹80,690 (25.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹4.2 L+₹97,070 (30.3%)Rejected-Finance | ₹4.2 L+₹97,070 (30.3%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | chahar constructions L6 | SALAMAT HUSSAIN L2 | M/S MAYA CONSTRUCTION L3 | HARPRASAD KAUSHAL INTERPRISESS L1 | RAJKUMAR SHARMA CONTRACTOR L5 | M/s SHASHAVEER SINGH CONTRACTOR AND SUPPLIERS L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance under water with slush and lehel including lift up to 1.50m and lead up to 30.0m including ramming and dressing by manual labour or machines or as directed by Engineer-in-charge. | 5,210 | Cum | 118 ₹6,14,780 | 59.5 ₹3,09,995 | 54 ₹2,81,340 | 44 ₹2,29,240 Lowest | 59.25 ₹3,08,692.5 | 66 ₹3,43,860 |
| 2.00 | Earth work in Silt clearance under water with slush and lehel including lift up to 1.50m and lead up to 200.0m including ramming and dressing by manual labour or machines or as directed by Engineer-in-charge. | 870 | Cum | 120 ₹1,04,400 | 58 ₹50,460 Lowest | 99 ₹86,130 | 105 ₹91,350 | 125.25 ₹1,08,967.5 | 66 ₹57,420 |
Tender Value
₹7.2 L
EMD Value
₹15,000
Closing Date
3 Jun 2026, 5:00 pmClosed
Executive Engineer
LDAC, AGRA
Clearance of Rohta Drain
2026_UPIDC_1145201_50
01/EE/2026-27
Open Tender
Civil Works
Item Wise
20 days
Clearance of Rohta Drain
Please refer Tender documents.
3 documents required · 3 mandatory
₹266
₹15,000
2 Jul 2026
28 May 2026
4 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance under water with slush and lehel including lift up to 1.50m and lead up to 30.0m including ramming and dressing by manual labour or machines or as directed by Engineer-in-charge. | 5,210 | Cum | - | - |
| 2 | Earth work in Silt clearance under water with slush and lehel including lift up to 1.50m and lead up to 200.0m including ramming and dressing by manual labour or machines or as directed by Engineer-in-charge. | 870 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_2163321.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .