Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-Finance | L1 | Accepted-Finance FINANCE ACCEPT | |
| 2 | L2₹21.2 L+₹12,462.03 (0.59%)Rejected-Finance | L2 | Rejected-Finance FINANCE REJECT | |
| 3 | L3₹21.3 L+₹23,023.08 (1.09%)Rejected-Finance | L3 | Rejected-Finance FINANCE REJECT |
Tender Value
₹21.1 L
EMD Value
₹42,250
Closing Date
3 Feb 2026, 2:00 pmClosed
BDO KHATAULI
BDO OFFICE KHATAULI
GRAM PIPALHERA SE KAKRALE WALE RASTE PER KHASRA SANKHYA 446M KE RAKBA 0.9320 HECT BHUMI PER MINI STADIUM KA NIRMAN KARYA
2026_RDUP_1107600_1
2746/LEKHA-V.NI./2025-26
Open Tender
Civil Works
Percentage
90 days
BDO KHATAULI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,978
Yes
BDO KHATAULI
₹42,250
4 Feb 2026
19 Jan 2026
3 Feb 2026
19 Jan 2026
3 Feb 2026
19 Jan 2026
E/w in excavation in foundation in ordinary soil I/c lead 30m. & lift 1.5m.as SI.251(a)
Base Conc. in 1:4:8 in Cement ,F/sand and 40mm B/Ballast in Fdn as SI-275
M-150class Brick Work in 1:4 cement and C/ sand mortar in foundation and plinth I/C supply of all materials ,labour and T&P etc. required for proper completion of the work as per SI No.305(a)
M-150 Class B/works in 1:4 Cement & C/Sand mix mortar in super str incl supply of all materials labour, Tools and Plants etc required for proper completion of the work as per SI No.305+309+310+ Difference cost of fine sand to coarse sand
12mm plaster in 1:4 cement & C/ sand mortar complete in all respects. as per SI. N0-584(a)
Cement concrete in 1:2:4 with cement , coarse sand and 20mm gauge stone grit in . I/C supply of all materials ,labour and T&P etc. required for proper completion of the work as per SI No.279 (a)
P/f of Ms iron work for ms grills, gates, railing in i/c all as per SI No-502(a)
R.C.C in 1:1.5:3 cement, coarse sand & 20mm stone grit for i/c all.as per SI-284
M.s. or tor steel in plain such as RCC work i/c its cutting, bending & binding complete as SI.504
Finishing wall with weather Coat paint in two coat along with one coat cement primer in all as per Si No 660+661 of chapter 15
Painting in two coat over one coat of primer on new iron & wood complete as per SI.No-641+642
S/F Submerisible pump 1 hp i/c all.
S/F sign board i/c all comp. at site.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2044191.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .