Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance Accepted as L1 |
| 2 | L2₹3.1 L+₹8,915.16 (3.00%)Rejected-Finance | ₹3.1 L+₹8,915.16 (3.00%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 L+₹8,915.16 (3.00%)Rejected-Finance 109 NEW FULBAGAN KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | ₹3.1 L+₹8,915.16 (3.00%) | L3 | Rejected-Finance L3 |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
7 Aug 2026, 2:00 pmClosed
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
DESILTING OF OPEN SURFACE DRAIN ALONG HELEN KELLER SARANI AND SURROUNDING AREA IN WARD NO 79 UNDER BR IX
2026_KMC_1035518_1
S_D_CEN_BRIX_HCGR_2616
Open Tender
CIVIL WORKS
Percentage
21 days
HELEN KELLER SARANI AND SURROUNDING AREA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
9 Sept 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of silt, slush, musks or any other foul materials from open drains or nikashis of any size and depth, manholes, gully pits, catch pits etc. by any other method approved of impure / inflammable / asphyxiating gases from the drains etc. with staging if necessary, stacking of the materials properly away from traffic lane as far aspracticable lead upto 75 mtr. with all labour and materials and hire charges of tools and plants as per direction of Engineerin- Charge.For Open Nikashi or Drain. Transportation of silt, slush or other foul materials from the working site and disposal of the same beyondthe area of Municipal Corporation / Municipality / Notified Area Authority / Industrial Township Authority including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. complete (Land for disposal to be arranged by the contractor). (Payment to be made on the basis of stack measurement after deducting sinkage/shrinkage at the rate of 1/9th of volume) For Day : | - | CUBIC METER | 735 | - |
| 55 | Sub Total | - | - | - | - |
| 56 | GST 0% | 1 | Nos | - | - |
| 57 | CESS 1% | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_2543657.xls
BOQ • 0.34 MB
f.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .