Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.1 CrAccepted-AOC NIL A 13 MA0NO 37 MOHADDIPUR POLICE STATION CANTT DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹6.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹6.2 Cr+₹3.3 L (0.55%)Rejected-Finance NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹6.2 Cr+₹3.3 L (0.55%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹6.3 Cr+₹19.2 L (3.13%)Rejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹6.3 Cr+₹19.2 L (3.13%) | L-3 | Rejected-Finance L-3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical IDT incomplate Registration not uploaded |
| Sl No | Description | Qty | Unit | M/S SENGER CONSTRUCTION L2 | AJAY ASSOCIATES L1 | NIKHIL CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION CROSS REGULATOR | ||||||
| 1.01 | Earth work in excavation of foundation including cost digging & refilling the trenches with its proper disposal.as directed by Engineer-in-charge. | 4,836 | M3 | 151 ₹7,30,236 | 50 ₹2,41,800 Lowest | 149 ₹7,20,564 |
| 1.02 | Earth work in making coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 3,547 | M3 | 201 ₹7,12,947 | 150 ₹5,32,050 Lowest | 235 ₹8,33,545 |
| 1.03 | Earth work in making canal section including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. | 925 | M3 | 80 ₹74,000 | 70 ₹64,750 Lowest | 95 ₹87,875 |
| 1.04 | Laying C.C. (M-10) below foundation including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | 365 | M3 | 11,000 ₹40,15,000 | 10,500 ₹38,32,500 Lowest | 11,190 ₹40,84,350 |
| 1.05 | Laying C.C. 1:2:4 (M-15) in wing wall with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | 763 | M3 | 11,251 ₹85,84,513 Lowest | 11,600 ₹88,50,800 | 11,800 ₹90,03,400 |
| 1.06 | Laying R C.C. 1:1.5:3(M-20) in below parapet wing with crushed stone grit size 4.75- 20 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | 22 | M3 | 11,551 ₹2,54,122 Lowest | 11,800 ₹2,59,600 | 12,050 ₹2,65,100 |
| 1.07 | Centering & shuttering including cost of all complete.as directed by Engineer-in-charge. | 3,571 | M2 | 851 ₹30,38,921 Lowest | 970 ₹34,63,870 | 990 ₹35,35,290 |
| 1.08 | Laying C.C. 1:1:2 (M-25) in raft, abt, Pier including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | 1,675 | M3 | 11,551 ₹1,93,47,925 Lowest | 11,900 ₹1,99,32,500 | 12,048 ₹2,01,80,400 |
| 1.09 | Brick Work in 1:3 C:M in parapet, with coarse sand &cement including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | 45 | M3 | 6,051 ₹2,72,295 Lowest | 6,900 ₹3,10,500 | 7,710 ₹3,46,950 |
Tender Value
₹6.7 Cr
EMD Value
₹13.5 L
Closing Date
9 Apr 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
As per tender Notice
2026_UPIDC_1106549_6
08/SE/2025-26
Open Tender
Civil Works
Item Rate
365 days
Tulsipur Balrampur
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹13.5 L
Yes
22 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION CROSS REGULATOR | - | - | - | - |
| - | Earth work in excavation of foundation including cost digging & refilling the trenches with its proper disposal.as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Earth work in making coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Earth work in making canal section including cost of all lead lift material labour T&P etc.as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Laying C.C. (M-10) below foundation including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Laying C.C. 1:2:4 (M-15) in wing wall with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Laying R C.C. 1:1.5:3(M-20) in below parapet wing with crushed stone grit size 4.75- 20 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Centering & shuttering including cost of all complete.as directed by Engineer-in-charge. | - | M2 | - | - |
| - | Laying C.C. 1:1:2 (M-25) in raft, abt, Pier including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | - | M3 | - | - |
| - | Brick Work in 1:3 C:M in parapet, with coarse sand &cement including cost of all lead lift material, labour T&P etc.as directed by Engineer-in-charge. | - | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_2113585.xls
BOQ • 0.26 MB
793500.pdf
PDF • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .