Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | L1 | Accepted-AOC All conditions are satisfied |
Tender Value
Refer Docs
EMD Value
₹9,700
Closing Date
28 Aug 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/BBGTPS
BBGTPS/CHENNAI-12
Works contract of Fire and Safety
2020_EB_175594_1
SpecNo.05/2020-21
Open Tender
Miscellaneous Works
Item Rate
180 days
BBGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,700
Yes
24 Nov 2020
14 Aug 2020
29 Aug 2020
15 Aug 2020
28 Aug 2020
15 Aug 2020
90 days
Amount
FREQUENTLY OPERATING WORKS
Centralised A/c plant pump Gland leak tightness, Checking belt tension in compressor,detection of gas leak, water make up in the cooling tower tray, clearing any choking in spinklers,AHUs, etc.
Removal of Filters, cleaning & fixing in AHU's /FUPH Pump filters cleaning /AHU chiller coil cleaning
A/C plant condenser cleaning works / Oil seal/Head gasket replacement/AHU duct filter/Diffuser cleaning.
Fire protection System Gland tightness in leaky valves and Pumps, clearing the chocked drain lines, checking the levels of lub oil,fuel,radiater water,etc…
Works involved Fire protection system testing (actuating the MVWS,HVWS,FOAM Systems and normalaised by balancing of all misbalanced valves and keep the system ready)/system Header draining and pressurising works for attending emergency nature works
15 Nos of 45 kg Co2 cylinder weighing and checking in unit 3/unit 4 /set of 24 nos of 4.5 Kg Co2 fire extinguishers weight, hose clearing
8 Nos of 45 kg Co2 cylinder weighing and checking in unit 1/unit 2
Set of 3 nos of 22.5 kg Co2 fire extinguishers weight & hose Clearing/Checking and cleaning of pressurised fire Extinguisher/Checking & Cleaning of Co2 flooding system in unit 1/unit 2
All Fire hose boxes cleaning and hose within a box drying work/Valve chambers cleaning.
Set of 4 nos of 10 kg DCP/ set of 6 nos of 2 kg DCP /set of 4 nos of mech foam portable fire extinguishers weighing, powder /liquid checking works/ Checking & Cleaning of Co2 flooding system in unit 3/unit 4
One no of 75 Kg DCP fire Extinguishers weight, powder sieving, hose clearing
Diesel Engine Fuel Filling In DG set / FWPH diesel Engines
Cleaning of Spray Nozzle in one transformer /weighing & Servicing of 8 nos 45 Kg Co2 cylinder with puncturing devices in unit 3/unit 4/ co2 dampers checking and oiling of one unit.
Fuel handling system Pumps&valves gland tightness, removal of weeds inTank farm area,Clearing the floating roof, pantoons and sealing,etc..
HSD Tanker unloading /Centrifuge Tray Cleaning
12KL Naphtha Tanker unloading
20KL Naphtha Tanker unloading
Retification works /Bowl cleaning works in one no FUPH Centrifuge
Cleaning of any one of the area Equipments ( FUPH / FWPH/A/Cplant/Fuel tank area/DG set ) /Cleaning of all portable fire extinguishers / Lubrication of all pumps/Lubrication of all Valves & Hydrants/Cooling tower &sprinkler cleaning 1 no /FUPH trench and pit.
Rectification works in any Pump/ Valve/Deluge Valve FPS,FHS and A/C plant system
Gland/Gland bolts/Gland packing replacement in FPS,FHS,A/C plant valve and pumps system
Window A/c / spilt A/c/package unit coils cleaning works
Painting works in FPS,FHS and A/C plant system
Welding works involving gas / arc / cold cutting in pipes, structures and platform.
Miscelaneous works in FPS,FHS and A/C plant system
Rectification works in any Valves/pumps/pipeline gasket provision or Valve replacing/removing/Pump coupling & decoupling/coupling bush replacement/Pump alignment, Compressor/AHU belt removal & provision/Lub oil/ filter replacement in compressor / R22 transferring from one compressor to another compressor of A/C plant in FPS,FHS and A/C plant system.
Diesel Engine Fuel/luboil filters/luboil/Fuel hose replacement /Air lock release in FWPH engine per No/R22 gas refilling in A/c plant compressor/Lifting of materials
RARELY OPERATING WORKS
Foam testing for each no of Naphtha tank/2nos of Diesel tank
Clearing of chocking in MVWS Nozzles in cable gallery/Naphtha tank one side of one tank.
Clearing of chocking in MVWS Nozzles in each Diesel tank/MVWS nozzles upto 6 nos in naphtha tank.
Pump breakdown/Overhauling works in FPS,FHS and A/C plant system
Leak testing of A/C plant compressor system By N2 gas
Emergency break down works in any one of FPS, FHS and centralised A/c system
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .