Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.3 L+₹31,606.08 (6.30%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.6 L+₹53,686.18 (10.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.6 L+₹55,578.76 (11.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.3 L
EMD Value
₹12,620
Closing Date
5 Aug 2026, 4:00 pmClosed
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Development of Nagathoo Khul by way of Cement Concrete Jacketing and others important allied works (Balance work)
2026_PWDJK_317976_1
InFC E-NIT No 02 2026-27-Hyd-Grz-53-69 E-tendering Dated-25 -07-2026
Open Tender
Civil Works
Percentage
40 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Yes
Executive Engineer Hydraulic Division Gurez
₹12,620
Executive Engineer Hydraulic Division Gurez
6 Aug 2026
27 Jul 2026
6 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 68.63 | Cum | 592.9 | ₹40,693.1 |
| 2 | Providing and laying of dry stone soiling hand packed tightly including carriage complete job. | 30.18 | Cum | 1,200 | ₹36,210 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)Nallah. | 55.56 | Cum | 5,500 | ₹3,05,558 |
| 4 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate.Nallah. | 202.86 | Sqm | 562.15 | ₹1,14,037.75 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns./Walls. | 138.84 | Sqm | 286.35 | ₹39,756.83 |
| 6 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand). | 163.78 | Sqm | 283.8 | ₹46,480.76 |
| 7 | Carriage of Materials by Mechanical Transport including loading,unloading and Stacking complete.Cement with an avg.lead 2km. | 17.17 | MT | 131.06 | ₹2,250.3 |
| 7.01 | Sand with an avg.lead 5km. | 31.02 | Cum | 200.74 | ₹6,226.95 |
| 7.02 | Aggregate with an avg.lead 5km. | 57.55 | Cum | 200.74 | ₹11,552.59 |
| 8 | Carriage of Materials by Manual Means including loading unloading and stacking.Cement with an avg.lead 150mtr. | 17.17 | MT | 150.32 | ₹2,580.99 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1045023.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .