Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr | L1 | Accepted-AOC L1 BIDDER QUOTED RATE FOUND REASONABLE |
| 2 | L2₹4.0 Cr+₹20.5 L (5.45%)Rejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹4.0 Cr+₹20.5 L (5.45%) | L2 | Rejected-Finance OTHER THAN L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Fulfilling Eligibility criteria of A Class contractor the firm is required to complete at least two works of Rs 4 Cr each or One work of Rs 6 Cr. However the firm has not completed any of these works to fulfill eligible criteria for provn enlistment. |
| Sl No | Description | Qty | Unit | S. K. CONSTRUCTION L1 | Jasraj & Company L2 |
|---|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 2,87,51,000 ₹2,87,51,000 Lowest | 3,12,70,800 ₹3,12,70,800 |
| 2.00 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY " as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 28,500 ₹28,500 Lowest | 52,754.13 ₹52,754.13 |
| 3.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 8,01,000 ₹8,01,000 | 7,90,359.08 ₹7,90,359.08 Lowest |
| 4.00 | Lump sum price worked out by the contractor for "ROAD, PATH, CULVERT AND HARDSTANDING" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 24,51,000 ₹24,51,000 | 22,75,761.34 ₹22,75,761.34 Lowest |
| 5.00 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,27,000 ₹1,27,000 Lowest | 1,35,228.48 ₹1,35,228.48 |
| 6.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 9,51,000 ₹9,51,000 Lowest | 10,67,445.61 ₹10,67,445.61 |
| 7.00 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 1,01,000 ₹1,01,000 Lowest | 1,84,072.68 ₹1,84,072.68 |
| 8.00 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 11,50,000 ₹11,50,000 Lowest | 14,20,890.83 ₹14,20,890.83 |
| 9.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 8,51,000 ₹8,51,000 | 7,64,473.28 ₹7,64,473.28 Lowest |
| 10.00Sch 'A' Part-X MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under SCH A PART-X (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK schedule). | |||||
Tender Value
₹3.5 Cr
EMD Value
₹4.3 L
Closing Date
28 Feb 2026, 6:00 pmClosed
CHIEF ENGINEER JAIPUR ZONE JAIPUR
HEAD QUARTER CHIEF ENGINEER JAIPUR ZONE JAIPUR
PROVISION OF SHOPPING COMPLEX AT BHARATPUR MIL STATION
2026_MES_749777_1
80927
Open Tender
Civil Works
Lump-sum
365 days
GE BHARATPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
GE Bharatpur
₹4.3 L
Yes
HEAD QUARTER CHIEF ENGINEER JAIPUR ZONE JAIPUR
5 Jun 2026
23 Jan 2026
2 Mar 2026
23 Jan 2026
28 Feb 2026
21 Feb 2026
30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 2,36,90,000 | ₹2,36,90,000 |
| 2 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY " as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 28,172.82 | ₹28,172.82 |
| 3 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 8,15,591.53 | ₹8,15,591.53 |
| 4 | Lump sum price worked out by the contractor for "ROAD, PATH, CULVERT AND HARDSTANDING" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 22,75,761.34 | ₹22,75,761.34 |
| 5 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 1,35,228.48 | ₹1,35,228.48 |
| 6 | Lump sum price worked out by the contractor for "AREA DRAINAGE " as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 10,67,445.61 | ₹10,67,445.61 |
| 7 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 1,05,184.39 | ₹1,05,184.39 |
| 8 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES | 1 | LUMP SUM | 12,14,572.69 | ₹12,14,572.69 |
| 9 | Lump sum price worked out by the contractor for "SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES | 1 | LUMP SUM | 10,19,297.71 | ₹10,19,297.71 |
| 10Sch 'A' Part-X MISC ITEMS (TO BE QUOTED BY CONTRACTOR) Notes: (i) This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under column 5 signifies this fact only. (ii) Excavation and earth work except for the items which categorically includes for same shall be measured and paid separately under SCH A PART-X (SITE CLEARANCE, SITE DEVELOPMENT AND EARTH WORK schedule). | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tender80927.pdf
Tender Documents • 12.82 MB
BOQ_839704.xls
BOQ • 1.23 MB
Drgn80927.pdf
Additional Documents • 10.53 MB
AMD80927-02.pdf
PDF • 0.28 MB
AMD80927-01.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .