Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 153 KHUSHIPURA STATE BANK TIRAHA MAIN MARKET ROAD GEETA CLOTH HOUSE RATH HAMIRPUR HAMIRPUR UTTAR PRADESH 210431 | HAMIRPUR | UTTAR PRADESH | 210431 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
15 Jan 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The GM Power and Project
Office of the GM Power and Project
Overhauling of ESP of 300MW Unit 7 DPL under AHPEM DPL
2025_DPL_978181_1
WBDPL/PP/T/ 12011(99)/10/ 2025/AHP EM/E/298
Open Tender
Miscellaneous Works
Item Rate
Office of the GM Power and Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹73,000
Conference Room, Technical Building
11 Feb 2026
22 Dec 2025
19 Jan 2026
22 Dec 2025
15 Jan 2026
25 Dec 2025
24 Dec 2025
Overhauling of ESP of 300MW Unit 7 DPL
Dry cleaning work: Dry cleaning of ESP starting from ESP inlet duct, all ESP hoppers, gas distribution screens, all emitting electrodes, collecting plates & other allied zones
LP Water Jet cleaning: Water jet washing of total ESP internal including all hoppers, collecting plates, emitting electrodes & other allied zones. At the time of water washing if any chokage is found in the hoppers, the same shall be cleared immediately. All arrangements including hose & LP pressurizing pumps for the job has to be arranged by the vendor
EERM system: checking & rectification of emitting rapping system of all the ESP fields thoroughly including housing bearing assembly (checking & replacement if needed); job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields.(Max. 20% of total qty)
CERM system: : checking & rectification of collecting rapping system of all the ESP fields thoroughly; job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields. (Max. 20% of total qty)
Support insulator system: Replacement/Repair (Max 20% of total qty) & cleaning of insulator & heater (100% of total qty)
Hopper heater: Replacement/Repair (Max.20% of total qty) & cleaning of heater (100%)
GD screen: Replacement (Max. 20% of total qty)/Repair & alignment of inlet GD screen (three stages)
Anvil pads: Replacement/Refitting of anvil pads of all collecting plates of ESP fields, if required after checking.
Shock bar system: Repair & alignment of shock bar
Baffle plates: Repair/refitting of baffle plates of all ESP hoppers (56 nos)
CERM & EERM Gear boxes: Lubrication of collecting & emitting rapping motor & its gear box. Servicing/rectification/replacement of gearbox if needed.
ESP field meggering: Meggering of all ESP fields & rectification if necessary until it reaches the desired value.
TR sets: The entire transformer rectifier set should be inspected thoroughly. Cleaning of the TR body, checking of oil level, top up if necessary, changing silica gel; OC & SC test of all 28 TR sets.
HV safety breakers: alignment of all safety breakers to be checked & rectified.
ESP MCC panels: All the MCC panels & incomer breakers including two nos dry type transformers to be cleaned & tightness checked.
Suspension frame & I beam: checking & rectification of suspension frame & I beam of A pass & B pass. Suspension point of collecting plate & emitting wire also to be checked.
ESP & inlet/outlet duct Manhole doors: inspection & repair of all manhole doors & replacement of all rope gaskets.
ESP hopper liner welding; Inspection(Demetering) & repair of hopper walls/liner welding by scaffolding of all hoppers
Inlet guide vane: checking/repair/replacement & strengthening of ESP inlet guide vane
ESP hopper ACC checking: ESP hopper DLI probe & controller checking/calibration/replacement
Shaft insulator system: Replacement/cleaning of shaft insulators & heaters
Gap adjustment of all plates: thorough checking of all collecting plates, straightening of plates if required. Gap adjustment between collecting plates. Inspection & replacement of emitting electrodes & field alignment
Fixing/repairing/realignment of collecting plates at suspension points & shock bar portion of all ESP fields as per requirement
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.51 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_2383950.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .