Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹36.2 Laccepted-aoc | ₹36.2 L | accepted-aoc |
Tender Value
₹36.2 L
EMD Value
₹90,415
Closing Date
15 Apr 2026, 10:30 pmClosed
Karnataka Forest Department
ACF Mangaluru
Maintenance of Second year Plantation IOCL-Thannirbavi Mangaluru Range
KFD/2026-27/OW/WORK_INDENT35442
KFD/2026-27/OW/WORK_INDENT35442
Open
Other Works
Electronic Documents, First(One Cover)
KFD DCF Territorial Division Office Mnagaluru
7 documents required · 7 mandatory
₹910
₹90,415
15 Apr 2026
1 Apr 2026
13 Apr 2026
Maintenance of Second year Plantation IOCL-Thannirbavi Mangaluru Range
Reopening of Pits for 0.45x0.45x0.45 is equal to 0.0911 cum each pit (15percent of Original Pits) 863 pits Zone IV
Reopening of Pits for 0.60x0.60x0.60 is equal to 0.216 cum each pit (15percentof Original Pits) 750 pits Zone III
Reopening of Pits for 0.45x0.45x0.45 is equal to 0.0911 cum each pit (15percentof Original Pits) 450 pits Zone II
Reopening of Pits for 0.30x0.30x0.30 is equal to 0.027 cum each pit (15percentof Original Pits) 300 pits Zone I
Purchase of imported red earth for refiling the pits 0.0161cum FOR ZONE I II III&IV for 20percent
Purchase of farmyard mannure 10percent
conveyance of farmyard mannure and red earth soil on headload from dumping site to planting location near each pit
Providing of 6x9 Seedlings (includes Collection and transportation and planting of wildlings cuttings to nursery)(FOR ZONEI II)
Loading of polythene bagged seedlings into the vehicle at the nursery site and unloading at the site nearest to the planting site. Seedlings raised in 6 x 9 size bags ( FOR ZONE I II &IV) 15percent
Loading of polythene bagged seedlings into the vehicle at the nursery site and unloading at the site nearest to the planting site. Seedlings raised in 8 x 12 size bags ( FOR ZONE III) 15percent
Transport of polythene bagged seedlings in hired truck from the nursery site to planting site.Seedlings raised in 6 x 9 size bags Distance from 11 to 20 Km ( FOR ZONE I II &IV)
Transport of polythene bagged seedlings in hired truck from the nursery site to planting site.Seedlings raised in 8 x 12 size bags Distance from 11 to 20 Km ( FOR ZONE III)
Conveyance of polythene bagged seedlings on headLoad from the dumping site to planting location near each trench / pit(distance up to 3 Km) 6 x 9 size bagged seedlings ( FOR ZONE I II &IV)
Conveyance of polythene bagged seedlings on headLoad from the dumping site to planting location near each trench or pit(distance up to 3 Km) 8 x 12 size bagged seedlings ( FOR ZONE III)
Watering polythene bagged seedlings atplanting site by dipping in water including carrying of water 6 x 9 size bagged seedlings (FOR ZONEI II &IV)
Watering polythene bagged seedlings atplanting site by dipping in water including carrying of water 8 x 12 size bagged seedlings (FOR ZONE III)
Planting of P.B seedlings after tearing with blade &removing the polythene bags in trenches or pits including scooping the soil to required depth pressing the soil gently around theseedlings after p...
Planting of P.B seedlings after tearing with blade &removing the polythene bags in trenches or pits including scooping the soil to required depth pressing the soil gently around theseedlings after p...
Purchase of NPK or DAP (50gms per plant)
Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil.-1 time
First weeding around the plants pits to a radius of 60 cm (FOR ZONE II III & IV)
Scraping of grass and other weed growth around the plant (Pits)(Scraping item is allowed only in grass-infested areas) 50 cm. radius around the plant (FOR ZONE II III & IV)
Hoeing & soil working with pickaxe around the plant to a depth of 15 cm & to a radius of 60 cm. so as to loosen the soil around the plants (pits only). (FOR ZONE II III & IV)
Protection of the plantation as per the standard norms( for (for 5Ha as a unit during the year and pro -rata for different extent for the actual period) from 01.04.2026 to 31.03.2027 is equal to3...
Hand watering to the casuarina plants in the coastal plantation - From April 2026 to May 2026 for 8 times
Hand watering to the casuarina plants in the coastal plantation - From December 2026 to March 2027 for 16 times
Providing Motor Pump accessories for watering to the seedlings
Fire Protection in Forest Plantations: New Fire Lines: Cutting of all existing weed growth to a width of 3m. heaping burning and re-burning in younger plantations
Clearance of jungle growth scattered type low density areas burning heaping and re-burning to make the suitable for plant growth (2 times)
Providing shade net around plantation area ( 2 times)
Protection and cleaning of plantation beach infront of plantation. from 01.07.2026 to 31.03.2027 is equal to 274 days (For Beach Cleaning)1 no.
Maintenance of 8x12 PB Seedlings Zone III
Maintenance of 6x9 PB Seedlings Zone IV
Miscellaneous expenses
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender notification.pdf
Tender Document • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .