Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.2 LAccepted-AOC 34 KAISER GANJ MANDI DIST MEERUT UP 250002 | MEERUT | UTTAR PRADESH | 250002 | ₹38.2 L Quoted ₹38.7 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹42.8 L+₹4.1 L (10.6%)Rejected-Finance 84 POLO HILLS OPPOSITE SBI BRANCH EAST KHASI HILLS SHILLONG MEGHALAYA 793001 | EAST KHASI HILLS | MEGHALAYA | 793001 | ₹42.8 L+₹4.1 L (10.6%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹43.5 L+₹4.8 L (12.3%)Rejected-Finance RONGMEN BLOCK IV NEAR UMROI MILITARY STATION P O BARAPANI SHILLONG 793103 | SHILLONG | RI BHOI | MEGHALAYA | 793103 | ₹43.5 L+₹4.8 L (12.3%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹44.8 L+₹6.1 L (15.7%)Rejected-Finance | ₹44.8 L+₹6.1 L (15.7%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹45.0 L+₹6.3 L (16.4%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | ₹45.0 L+₹6.3 L (16.4%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S BISWA CONSTRUCTION L6 | M/s Gupta Construction L1 | Bhuiya Construction L8 | S K ENTERPRISE L7 | M/S DEEDAR ENTERPRISE L5 | M/s B.Citymai Syiem L2 | M/s Richard R Khongwir L4 | M S Umesh and Co L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down chowkhats with shutters (without taking off shutters from the frames) & removing from site area n.exc 1.5 Sqm each complete all as directed. | 90 | Each | 255 ₹22,950 | 200 ₹18,000 | 260 ₹23,400 | 160 ₹14,400 Lowest | 180 ₹16,200 | 210 ₹18,900 | 220 ₹19,800 | 210 ₹18,900 |
| 2.00 | Taking down chowkhats with shutters (without taking off shutters from the frames) & removing from site area exc 1.5 Sqm & n. exc 4.00 sqm each complete all as directed. | 48 | Each | 81 ₹3,888 | 260 ₹12,480 | 90 ₹4,320 | 80 ₹3,840 | 65 ₹3,120 | 300 ₹14,400 | 74 ₹3,552 | 62 ₹2,976 Lowest |
| 3.00 | Taking down Shutters of any description exceeding 1 sqm but not exceeding 2.0 sqm for each leaf all as specified. | 10 | Each Leaf | 80 ₹800 | 60 ₹600 Lowest | 90 ₹900 | 90 ₹900 | 65 ₹650 | 100 ₹1,000 | 74 ₹740 | 62 ₹620 |
| 4.00 | Taking down Shutters of any description not exceeding 1 sqm for each leaf all as specified. | 10 | Each Leaf | 80 ₹800 | 60 ₹600 Lowest | 90 ₹900 | 100 ₹1,000 | 65 ₹650 | 100 ₹1,000 | 78 ₹780 | 62 ₹620 |
| 5.00 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 4.35 | Cubic Meter | 1,100 ₹4,785 Lowest | 1,500 ₹6,525 | 1,800 ₹7,830 | 2,000 ₹8,700 | 1,600 ₹6,960 | 1,650 ₹7,177.5 | 1,650 ₹7,177.5 | 1,520 ₹6,612 |
| 6.00 | Dismantling wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets all as directed. | 100 | Square Meter | 22 ₹2,200 | 20 ₹2,000 Lowest | 40 ₹4,000 | 30 ₹3,000 | 25 ₹2,500 | 25 ₹2,500 | 24 ₹2,400 | 29 ₹2,900 |
| 7.00 | Taking up or down steel tubing and connections, including cleaning for re-fixing or removal to store 15 mm dia | 60 | Running Meter | 22 ₹1,320 | 20 ₹1,200 Lowest | 40 ₹2,400 | 30 ₹1,800 | 25 ₹1,500 | 28 ₹1,680 | 24 ₹1,440 | 29 ₹1,740 |
| 8.00 | Taking up or down steel tubing and connections, including cleaning for re-fixing or removal to store 20 mm dia | 30 | Running Meter | 22 ₹660 Lowest | 30 ₹900 | 40 ₹1,200 | 30 ₹900 | 25 ₹750 | 32 ₹960 | 24 ₹720 | 23 ₹690 |
| 9.00 | Demolition of cement concrete of any description and in any position complete all as specified. | 1.5 | Cubic Meter | 1,800 ₹2,700 | 1,500 ₹2,250 | 1,800 ₹2,700 | 1,800 ₹2,700 | 1,400 ₹2,100 Lowest | 1,620 ₹2,430 | 1,620 ₹2,430 | 1,520 ₹2,280 |
| 10.00 | Demolition of Precast concrete block/ Brickwork or stone/boulder masonry, laid with cement morter complete all as directed. | 1 | Cubic Meter | 1,900 ₹1,900 | 1,600 ₹1,600 | 1,620 ₹1,620 | 1,900 ₹1,900 | 1,500 ₹1,500 Lowest | 1,720 ₹1,720 | 1,740 ₹1,740 | 1,630 ₹1,630 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
15 Jun 2026, 6:00 pmClosed
GE (I) (AF) Shillong
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
REPAIR OR MAINTENANCE TO WALL PLASTERING, FLOOR OR WALL TILING, PLUMBING, JOINERY, PLINTH PROTECTION ETC OF SMQ AREA AT HQ EAC (U) AF UNDER GE (I) (AF) SHILLONG
2026_MES_767722_1
8030/26/E8
Open Tender
Civil Works
Item Rate
180 days
GE (I) (AF) Shillong
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (I) (AF) Shillong
₹70,000
Yes
2 Jul 2026
25 May 2026
17 Jun 2026
25 May 2026
15 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down chowkhats with shutters (without taking off shutters from the frames) & removing from site area n.exc 1.5 Sqm each complete all as directed. | 90 | Each | - | - |
| 2 | Taking down chowkhats with shutters (without taking off shutters from the frames) & removing from site area exc 1.5 Sqm & n. exc 4.00 sqm each complete all as directed. | 48 | Each | - | - |
| 3 | Taking down Shutters of any description exceeding 1 sqm but not exceeding 2.0 sqm for each leaf all as specified. | 10 | Each Leaf | - | - |
| 4 | Taking down Shutters of any description not exceeding 1 sqm for each leaf all as specified. | 10 | Each Leaf | - | - |
| 5 | Demolition of cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as directed. | 4.35 | Cubic Meter | - | - |
| 6 | Dismantling wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets all as directed. | 100 | Square Meter | - | - |
| 7 | Taking up or down steel tubing and connections, including cleaning for re-fixing or removal to store 15 mm dia | 60 | Running Meter | - | - |
| 8 | Taking up or down steel tubing and connections, including cleaning for re-fixing or removal to store 20 mm dia | 30 | Running Meter | - | - |
| 9 | Demolition of cement concrete of any description and in any position complete all as specified. | 1.5 | Cubic Meter | - | - |
| 10 | Demolition of Precast concrete block/ Brickwork or stone/boulder masonry, laid with cement morter complete all as directed. | 1 | Cubic Meter | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8030.pdf
Tender Documents • 1.07 MB
BOQ_859766.xls
BOQ • 2.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .