Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 16 B KURLA INDUSTRIAL ESTATE NEAR SEVA SADAN ROAD NARAYAN NAGAR GHATKOPAR W MUMBAI MAHARASHTRA 400086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
25 Apr 2022, 2:00 pmClosed
SE/ Operation / NCTPS-I
SE/ Operation / NCTPS-I North Chennai Thermal Power Station -I, Chennai- 600 120.
NCTPS I Operation Circle O and E Dn Fire Fighting Overhauling Hydraulic testing and Periodical maintenance of fire Extinguishers for a period of Six months from the date of handing over of site
2022_EB_228750_1
SE/OPN/ NCTPS-I/02 /2021-22
Open Tender
Power/Energy Projects/Products
Works
180 days
NCTPS I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,300
Yes
30 Apr 2022
11 Apr 2022
26 Apr 2022
11 Apr 2022
25 Apr 2022
11 Apr 2022
Amount
Charges for conducting Hydraulic test on DCP type, 5 Kg capacity extinguishers including painting the date of Hydraulic test conducted transporting of fire extinguishers from field to test room and vice versa.DCP 5 Kg capacity
Charges for conducting Hydraulic test on DCP type, 5 Kg capacity extinguishers including painting the date of Hydraulic test conducted transporting of fire extinguishers from field to test room and vice versa. DCP 50 Kg capacity
Charges for conducting Hydraulic test on DCP type, 5 Kg capacity extinguishers including painting the date of Hydraulic test conducted transporting of fire extinguishers from field to test room and vice versa. Water CO2/Mechanical Foam 9 litres capacity
Charges for conducting Hydraulic test on DCP type, 5 Kg capacity extinguishers including painting the date of Hydraulic test conducted transporting of fire extinguishers from field to test room and vice versa. Mechanical Foam 50 litres capacity
Charges for carrying out periodical maintenance works on fire extinguishers at various locations and elevations viz., Checking for pitting, corrosion, accidental discharge, wear and tear on the metal body and in the pressure retaining part, cap washers, extinguishers medium and operating mechanism for healthiness, cleaning the nozzle outlet and vent holes for any blockage with blower, pressure indicating devices for retaining of correct pressure/gas cartridges for correct weight and healthy sealing disc, lubricating the plungers, replacement of the washers, recording the facts on cylinder & maintenance cards including cost of consumables and T&P hire charges.5, 10 kg DCP, 9 Lt WCO2, Foam type extinguishers 9/22.5 kg CO2, 50/75 kg DCP, 50 Ltr. Foam type extinguishers.
MANICKAM ENGINEERING AND TRADERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .