Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC GROUND FLOOR GANGA APARTMENT KOTHABARI NEW BANSHBARI MALDA | 73 | L1 | Accepted-AOC Offered lowest rate | |
| 2 | L2₹25.3 L+₹17,430.05 (0.69%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L2 | Rejected-Finance Higher than L1. | |
| 3 | L3₹25.3 L+₹19,126.29 (0.76%)Rejected-Finance 49 DR S P MUKHERJEE ROAD DUMDUM CANTONMENT | L3 | Rejected-Finance Higher than L1. |
Tender Value
Refer Docs
EMD Value
₹52,100
Closing Date
31 Aug 2021, 2:30 pmClosed
EXECUTIVE_ENGINEER_MALDA_MECHANICAL_DIVISION_PHEDD
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Charges for Carrying of empty toners from Different Gaseous Chlrination Plant under Malda Arsenic Area WS Scheme Northern and Southern Sector and Balupur Water Supply Scheme to Durgapur Chemical Ltd. other plants as per availability
2021_PHED_339511_8
WBPHED/EE/MLMD/NIeT_06 of 2021-2022
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
5 documents required · 5 mandatory
₹52,100
Yes
13 Apr 2022
13 Aug 2021
2 Sept 2021
13 Aug 2021
31 Aug 2021
13 Aug 2021
Amount
Charges for Carrying empty chlorine toners (0.9 MT each) from Different Gaseous Chlrination Plant under Malda Arsenic Area W/S Scheme (Northern and Southern Sector) and Balupur Water Supply Scheme to Durgapur Chemical Ltd./ other plants as per availability including cost of loading, unloading and detention charges. (Single trip shall carry 4 to 6 nos. toner and Required filling of Toner is approx 57 nos)
Charges for filling of Liquid Chlorine in empty toners (0.9 MT each) at Durgapur Chemical Ltd. or others plants as per availability.
Charges for Carrying back filled in liquid chlorine toners 2 nos (0.9 MT each) from Durgapur Chemical Ltd./ other plants as per availability to Balupur Water Treatment Plant including cost of loading and unloading.
Testing of empty toner before filling as per IS Standards if required
Charges for replacement of cylinder valve, cylinder nut, cylinder spindle, cylinder cap and cylinder washer if requird including painting complete as per direction of EIC.
Supply and delivery of empty chlorine toner with all acessories having all statuory clearence and ready to use as per technical specification and as per direction of EIC. (Test Certificate of the toner and first filling permission from department of explosive are to be submitted during delivery) Design Pressure- 20.63 Kg/Cm2 Design Temparature- 65 Degree Celcius MOC- SA 516 Grade 60 Hydraulic Test Pressure- 30 Kg/Cm2 Tare Weight -600 Kgs (Approx) Water Capacity-780 Ltr. (Approx) Liquid Chlorine Capacity - 928 Kgs. (Approx) Southern Sector-2 nos. Northern Sector-2 nos.
MAKE AS PER DEPARTMENTAL APPROVED VENDOR LIST CIRCULATED VIDE MEMO NO.PHE/IV/2277/W-181/19 DATED- 25/09/2019
N.B. 1. Carrying & Loading unloading as per safety norms of filled toner should be taken carefully. 2. Payment will be made on actual no. of supply of filled up toner against documents of Durgapur Chemicals or other sources and documents needed for sl. no. 4 & 5.
Add GST @ 12%
Add Cess @ 1%
DEY ENTERPRISE
SANKAR PRASAD DUTTA AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .