| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.6 LAccepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹4.7 L+₹16,400 (3.58%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹4.7 L+₹17,300 (3.78%)Accepted-Finance | 3 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹4.7 L
EMD Value
₹9,500
Closing Date
25 Feb 2020, 3:00 pmClosed
Executive Engineer , MID Akhnoor Nowshera
Office of the Executive Engineer,MID Akhnoor Nowshera
Restoration by way of replacement with supply and installation of Electric control panel cum starter for pumping unit no. 1,2, 3 4 with allied works at LIS Kathar
2020_IFC_93200_1
77/MID/AN
Open Tender
Electrical Works
Item Wise
10 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor Nowshera
₹9,500
Yes
Office of the Executive Engineer,MID Akhnoor Nowsh
28 Feb 2020
19 Feb 2020
26 Feb 2020
20 Feb 2020
25 Feb 2020
20 Feb 2020
22 Feb 2020
Providing /fitting, installation, testing and commissioning of protection panel cum FASD star delta starters at L.I.S Kathar. Description of panel Designing, fabrication, installation, testing and commissioning of LT control panel 415 volts, AC-3 Phase, 50 Hz. For unit no. 1 & 2 , 50 HP motor at L.I.S Kathar . The panel shall be dust and vermin proof fabricated out of 16 SWG CR Sheet supported on M.S. angle of suitable size and having provision for fixing it on the ground with the help of foundation bolts. The panel should be sturdy enough for vibration free operation and should be equipped with suitable locking /sealing arrangements. The structure should be provided suitable entry and exit holes for incoming and outgoing cables. The panel should be given two coats of anti rust primer and two coats of steel grey enamel paint. The panel should have equipped with following components / features: 1. M.C.C.B.The panel should be fitted with an M.C.C.B. of suitable capacity, 1 no. volt meter, 1 no ammeter along with a set of CTs, 1 No. V.S.S., 1 No. A.S.S. and a set of RYB indicators at incoming side. 2. Star delta Starter: The panel should be fitted with a fully automatic star delta starter comprises of 3 Nos. air break contactor of suitable capacity (2 for main and delta supply, 1 No. air break contactor for star operation), 1 No. timer for change over the supply of motor from star to delta, 2 Nos. push buttons for start and stop operation of motor, 1 No. indicator .1 No. MCB 2 Amps. for the protection of internal control wiring, a neat and clean internal control wiring should be made with flexible copper cables to complete the star delta circuit of out going supply. 3. Protections devise / fault analyzer: A protections devise / fault analyzer shall be fitted with the panel with capability to protect the motor by isolating the power supply of motor by de-energizing the starter/panel from following electro-mechanical faults which may otherwise damage the motor windings : A. Voltage related fault: Single phasing, under voltage, over voltage, unbalance voltage. B. Current related fault: Over current / load, dry running, unbalance current / load, earth leakage, short circuiting. C. Mechanical fault: Locked rotor, broken shaft, a. Display line current of RYB Phase and also line voltage of RY and YB phase. b. Display and indicate trip status for over load, under load, single phase, unbalance, earth fault, over voltage, under voltage respectively. 4. Bimetal overload relay: A bimetal over load relay of suitable range should be fitted with in the starter as an extra protection to protect the motor in case of failure of fault analyzer with an isolation/bye pass switch to bye pass the fault analyzer. 5. Complete job includes cost of providing/ fitting ,transportation charges ,hire charges, tool and tackles charges,hire charges of skilled and unskilled labour, To and Fro transportation charges at site of L.I.S and all kinds of taxes thereof complete job
Providing /fitting, installation, testing and commissioning of protection panel cum FASD star delta starters at L.I.S Kathar. Description of panel Designing, fabrication, installation, testing and commissioning of LT control panel 415 volts, AC-3 Phase, 50 Hz. For unit no. 3 & 4 , 55 HP motor at L.I.S Kathar. The panel shall be dust and vermin proof fabricated out of 16 SWG CR Sheet supported on M.S. angle of suitable size and having provision for fixing it on the ground with the help of foundation bolts. The panel should be sturdy enough for vibration free operation and should be equipped with suitable locking /sealing arrangements. The structure should be provided suitable entry and exit holes for incoming and outgoing cables. The panel should be given two coats of anti rust primer and two coats of steel grey enamel paint. The panel should have equipped with following components / features: 1. M.C.C.B.The panel should be fitted with an M.C.C.B. of suitable capacity, 1 no. volt meter, 1 no ammeter along with a set of CTs, 1 No. V.S.S., 1 No. A.S.S. and a set of RYB indicators at incoming side. 2. Star delta Starter: The panel should be fitted with a fully automatic star delta starter comprises of 3 Nos. air break contactor of suitable capacity (2 for main and delta supply, 1 No. air break contactor for star operation), 1 No. timer for change over the supply of motor from star to delta, 2 Nos. push buttons for start and stop operation of motor, 1 No. indicator .1 No. MCB 2 Amps. for the protection of internal control wiring, a neat and clean internal control wiring should be made with flexible copper cables to complete the star delta circuit of out going supply. 3. Protections devise / fault analyzer: A protections devise / fault analyzer shall be fitted with the panel with capability to protect the motor by isolating the power supply of motor by de-energizing the starter/panel from following electro-mechanical faults which may otherwise damage the motor windings : D. Voltage related fault: Single phasing, under voltage, over voltage, unbalance voltage. E. Current related fault: Over current / load, dry running, unbalance current / load, earth leakage, short circuiting. F. Mechanical fault: Locked rotor, broken shaft, a. Display line current of RYB Phase and also line voltage of RY and YB phase. b. Display and indicate trip status for over load, under load, single phase, unbalance, earth fault, over voltage, under voltage respectively. 4. Bimetal overload relay: A bimetal over load relay of suitable range should be fitted with in the starter as an extra protection to protect the motor in case of failure of fault analyzer with an isolation/bye pass switch to bye pass the fault analyzer. 5. Complete job includes cost of providing/ fitting ,transportation charges ,hire charges, tool and tackles charges, hire charges of skilled and unskilled labour, To and Fro transportation charges at site of L.I.S and all kinds of taxes thereof. complete job
BEE AAR ENTERPRISES
NACHIKETA TECHNOLOGY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .