| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹9.4 L+₹17,935 (1.94%)Rejected-Finance | ₹9.4 L+₹17,935 (1.94%) | L2 | Rejected-Finance Being L2 due to high rate |
| Sl No | Description | Qty | Unit | M/s APN Builder Enterprices L2 | Govinda Swamy Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete 1:3:6 or richer Mix including disposal of material within 50 metres lead as per direction of Engineer – in – charge. Including all labour charges, transportation charges, minor tools labour cess GST etc. Complete. | 21 | Cum | 2,900 ₹60,900 | 1,000 ₹21,000 Lowest |
| 2.00 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 meters lead as per direction of Engineer-in-charge. Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete. | 821 | Kg | 20 ₹16,420 Lowest | 20 ₹16,420 Lowest |
| 3.00 | Providing and laying in position specified grade of cement concrete including the cost of cement, mainland stone agregates and mainland river sand, transportation charges of all materials to work site, all labour charges minor tools, GST, labour welfare cess etc complete. RCC 1:1.5:3 (1 cement,. 1.5 River sand and 3 graded stone aggregate 20mm nominal size) | 28 | Cum | 23,100 ₹6,46,800 | 22,500 ₹6,30,000 Lowest |
| 4.00 | Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position cost of binding wire, minor tools, cost of all materials, all labour charges, minor tools, GST, labour welfare cess etc. complete. | 14 | Qtl | 12,800 ₹1,79,200 Lowest | 16,000 ₹2,24,000 |
| 5.00 | Providing formwork including centering, strutting propping etc to give rough finish for footing, column, plinth beam, beam and slab etc., using 19 mm marine plywood including cost of plywood, nails, battens etc., all labour charges, transportation charges of all materials, minor tools and plants etc., complete. | 19 | Sqm | 1,100 ₹20,900 | 500 ₹9,500 Lowest |
| 6.00 | Steel work in built up tubular (round, square or rectangular hollow tubes etc) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washer Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete.etc. complete. | 85 | Kg | 185 ₹15,725 Lowest | 250 ₹21,250 |
| 7.00 | Finishing with Epoxy paint (Two Coats) at all location prepared and applied as per manufacturing specification including appropriate priming coat, including preparation of surface, cleaning, cost of paint, brushes, transportation charges, all labour charges, minor tools, labour welfare cess & GST etc., complete. | 4 | Sqm | 290 ₹1,160 | 250 ₹1,000 Lowest |
Tender Value
₹9.8 L
EMD Value
₹19,550
Closing Date
12 Dec 2025, 3:00 pmClosed
Executive Engineer(KandGN), ALHW, Campbell Bay
O/o The DCE(N), ALHW, Campbell Bay
Repairing of damaged wearing coat at Breakwater wharf and RCC old jetty in Campbell Bay, Great Nicobar Islands
2025_ALHW_888513_1
ALHW/EEC/CB/DB/TEND-21/2025-26
Open Tender
Civil Works
Item Rate
90 days
Campbell Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹19,550
29 Jan 2026
5 Dec 2025
13 Dec 2025
5 Dec 2025
12 Dec 2025
5 Dec 2025
5 Dec 2025 - 8 Dec 2025
Amount
Demolishing cement concrete 1:3:6 or richer Mix including disposal of material within 50 metres lead as per direction of Engineer – in – charge. Including all labour charges, transportation charges, minor tools labour cess GST etc. Complete.
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 meters lead as per direction of Engineer-in-charge. Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete.
Providing and laying in position specified grade of cement concrete including the cost of cement, mainland stone agregates and mainland river sand, transportation charges of all materials to work site, all labour charges minor tools, GST, labour welfare cess etc complete. RCC 1:1.5:3 (1 cement,. 1.5 River sand and 3 graded stone aggregate 20mm nominal size)
Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position cost of binding wire, minor tools, cost of all materials, all labour charges, minor tools, GST, labour welfare cess etc. complete.
Providing formwork including centering, strutting propping etc to give rough finish for footing, column, plinth beam, beam and slab etc., using 19 mm marine plywood including cost of plywood, nails, battens etc., all labour charges, transportation charges of all materials, minor tools and plants etc., complete.
Steel work in built up tubular (round, square or rectangular hollow tubes etc) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washer Including all labour charges, transportation charges, minor tools, labour cess GST etc. Complete.etc. complete.
Finishing with Epoxy paint (Two Coats) at all location prepared and applied as per manufacturing specification including appropriate priming coat, including preparation of surface, cleaning, cost of paint, brushes, transportation charges, all labour charges, minor tools, labour welfare cess & GST etc., complete.
M/s APN Builder Enterprices (BID ID -3332278)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_933891.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .