Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.9 LAdmitted-Finance | -1.11% | ₹9.9 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
3 Aug 2026, 11:00 amClosed
EXECUTIVE OFFICER
NAGAR PALIKA POKARAN
Completion of the unfinished community center and expansion of basic amenities near Shri Ramnath Ji Maharaj Dhuna, Pokaran.
2026_DLB_579038_1
RO NO 407 WORK NO 02
Open Tender
Civil Works
Percentage
90 days
POKARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E.O NAGAR PALIKA POKARAN
₹20,000
Yes
19 Aug 2026
29 Jul 2026
3 Aug 2026
29 Jul 2026
3 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 4,575 | - |
| 2 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | Cum | 4,860 | ₹4,855.14 |
| 3 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 22.27 | Sqm | 426 | ₹9,487.02 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 6,340 | ₹6,333.66 |
| 5 | Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : :Cement mortar 1:6 (1 cement : 6 coarse sand) extra for coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto two stories. | - | Cum | 6,617 | - |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. | - | SQM | 456 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: M-20 Grade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) | - | Cum | 7,660 | - |
| 8 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. Kg | 1,206.1 | KG | 83.3 | ₹1,00,468.13 |
| 9 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | - | Cum | 159 | - |
| 10 | Random rubble dry stone Kharanja (soling) under floor | 1 | Cum | 2,270 | ₹2,267.73 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Provisions.pdf
Tender Documents • 0.27 MB
BOQ_1028971.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .