| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance BHAGWATI NAGAR JAMMU | L1 | Accepted-Finance lowest | |
| 2 | L2₹1.7 L+₹900 (0.52%)Accepted-Finance | L2 | Accepted-Finance not lowest | |
| 3 | L3₹1.7 L+₹1,500 (0.87%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L3 | Accepted-Finance not lowest |
Tender Value
₹1.8 L
EMD Value
₹3,500
Closing Date
10 Nov 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
MID Jammu
Replacement of the wornout components of the 200KVA voltage stabilizer of LIS Lower Malpur along with other allied works
2023_IFC_235724_1
MID/J/e-NIT/2023-24/108
Open Tender
Repair and Maintenance Works
Item Wise
10 days
Lower
as per enit
8 documents required · 8 mandatory
₹200
EXECUTIVE ENGINEER MID JAMMU
₹3,500
Yes
16 Nov 2023
3 Nov 2023
11 Nov 2023
3 Nov 2023
10 Nov 2023
4 Nov 2023
Replacement of the wornout components of the 200KVA voltage stabilizer of LIS Lower Malpur along with other allied works
Replacement of the wornout components of the 200KVA voltage stabilizer of LIS Lower Malpur. Job includes disconnecting all the electrical connections of the stabilizer both on LT transformer side and LT distribution panel side by way of removing old rusted thimbles along with nuts and bolts. Shifting of the stabilizer to the nearest roadside by manual head load through upstairs approx.100mtrs and loading of the same in the transport vehicle for further carriage to the workshop by employing hydraulic crane and manual labour at site. Replacement of the wornout components of the voltage stabilizer at workshop by way of removing its top cover for extraction of inner assembly from the casing sump. Providing and Fitting of new 02 no. copper coils of requisite size and specifications, new insulation material and nuts/bolts, varnishing drying in hot air circulation. Lowering of the coils inside the casing. Also replacement to the damaged components of rotor switch assembly by providing/fitting of new set of brass bush rods for all individual phases on LT side. The job involves draining out the old transformer oil from the stabilizer and heating to de-moisturize it completely. Filling the heat treated transformer oil back into stabilizer and also providing/topping with 100 litres of fresh transformer oil. Providing and fitting of new top cover gasket and cover plate, nuts/bolts and complete reassembling of the stabilizer at workshop. Shifting back the voltage stabilizer to the site. Unloading the same at site employing hydraulic crane/manual labour and shifting by manual head load into the pump room for re-installation. Reinstallation of the voltage stabilizer in the pump room by fixing all the electrical connections, providing/fitting of new thimbles, nuts/bolts. Testing of the 200 KVA voltage stabilizer on partial load and then on full load at site. Complete job including cost of materials, cost of rebate on account of old copper scrap, skilled/semi skilled labour charges, hydraulic crane and tools and tackles required during the execution of the job. Replacement of the rusted/damaged delivery pipe 250mm dia. of pumping unit no.2 of LIS Upper Malpur. The Job involves dismantling of the already fitted M.S suction line by way of cutting the rusted nuts, bolts with gas cutter and extracting out the damaged gaskets and dismantling of civil structure wherever required. Extracting out the damaged M.S pipe pieces of 250mm dia. and its flanges, welding of the 2no.s M.S flanges with the new M.S pipe 250mm dia. 7.5 ft approx.( M.S pipe to be provided by the department) by double layer welding to avoid leakage. Refitting of the suction pipe line by providing/fitting of new gaskets, nut bolts wherever required using proper tools tackles i.e. chain pulley block & manual labour and making proper alignment of the pipe. Complete job includes cost of material, skilled labour charges, tools tackles charges and transport charges to the site.
Rebate on Old Parts
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS
NATIONAL ELECTRO-MECH COMPANY
NATIONAL ELECTRO-MECH COMPANY
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .