| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC Low Value |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC High Value |
| Sl No | Description | Qty | Unit | J.K Srinivasan Contractor L1 | KARUNAKARAN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Construction of Padipakam at Vellakulam Panchayat | |||||
| 1.01 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 11.07 | Cum | 263 ₹2,911.41 | 263.5 ₹2,916.95 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 2.45 | Cum | 5,444.8 ₹13,339.76 | 5,444.8 ₹13,339.76 |
| 1.03 | R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 8.37 | Cum | 9,473.48 ₹79,293.03 | 9,473.48 ₹79,293.03 |
| 1.04 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. | 10.91 | Sqm | 547.5 ₹5,973.23 | 547.5 ₹5,973.23 |
| 1.05 | Above GL | 44.46 | Sqm | 1,094 ₹48,639.24 | 1,095 ₹48,683.70 |
| 1.06 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification. | 0.7 | MT | 91,873 ₹64,311.10 | 91,873 ₹64,311.10 |
| 1.07 | Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification. | 10.66 | Cum | 6,250.15 ₹66,626.60 | 6,250.15 ₹66,626.60 |
| 1.08 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 33.71 | Sqm | 308 ₹10,382.68 | 308.85 ₹10,411.33 |
| 1.09 | Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm. thick in all floors including curing etc., complete complying with standard specification and as directed | 106.18 | Sqm | 284 ₹30,155.12 | 284.5 ₹30,208.21 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
15 Oct 2025, 3:00 pmClosed
Block Development Officer(B.Pt), Vembakkam
Block Development Office, Vembakkam
Excecution of MLA CDS 2025-2026 Construction of Padipakkam at Vellakulam Panchayat in Vembakkam Block
2025_RDTN_610259_1
A6/4343/2025 Date.22.09.2025
Open Tender
Civil Works - Others
Block Development Office, Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
17 Feb 2026
29 Sept 2025
15 Oct 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
Amount
Construction of Padipakam at Vellakulam Panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Above GL
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Colour Washing with best Distember two coats of approved colour over old including cost and conveyance of all materials and all labour charges, etc.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Paving the floor with scrach proof Design ceramic tiles of any colour and 305x305x6mm size laid in CM 1:3, 20 mm thickand pointing with white cement using 0.4kg/Sq m mixed with colouring pigments to suit colour of the tiles including finishing etc., complete
Steel Door
window
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC Open Light point / fan point (For electronic Regulator) SD 18
Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 65
Supply and run of 2 X 1.5 sq.mm (22 / 0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade in 25 mm dia GI pipe ( Class ' B ' ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 70
Supply and fixing of CFL bulb SD 80
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 110
Supply and fixing of TNEB Meter board SD 125
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KARUNAKARAN CONSTRUCTION (BID ID -1487338)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid