Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance | -1.11% | ₹10.7 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 LAdmitted-Finance | +0.00% | ₹10.8 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Latest GST document not enclosed |
Tender Value
₹10.8 L
EMD Value
₹21,580
Closing Date
12 Mar 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_305606_2
e-NIT 270 of REW Poonch 2025-26 Date 07-03-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Division Poonch
₹21,580
16 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
12 Mar 2026
7 Mar 2026
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level
Centering and shuttering including strutting, propping etc. and removal of form for A-- Columns, pillars, piers, abutments, posts and struts.
Centering and shuttering including strutting, propping etc. and removal of form for B-- Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for C-- EDGES
Carriage of Materials from source to Site Sand + Agg for 10 KM by MT
Add the Cost of CIB
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_992463.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid