Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance KUDITRE KARVEER KOLHAPUR | KOLHAPUR | MAHARASHTRA | 415101 | +0.00% | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹3.8 L (2.00%)Admitted-Finance | +2.00% | ₹2.0 Cr+₹3.8 L (2.00%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹9.6 L (5.00%)Admitted-Finance | +5.00% | ₹2.0 Cr+₹9.6 L (5.00%) | L3 | Admitted-Finance |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
16 Mar 2026, 6:00 pmClosed
EE RWS
ZP KOLHAPUR
CONSERVATION OF LAKE AT MOUJE VASAGADE TAL KARVEER DIST KOLHAPUR
2026_KOLHA_1285079_1
36/2025-26
Open Tender
Civil Works
Percentage
365 days
KOLHAPUR
attach separately
2 documents required · 2 mandatory
₹36,300
₹1.9 L
24 Jul 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUB WORK NO 1 - Desilting Deweeding
Dewatering
Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. ( prior approval of Super intending Engineer will be necessary) | 2,880 | Bhp/Hr | 245.3 | ₹7,06,464 |
| 2 | Desilting the Lake in wet or dry condition excluding Conveying materials obtained from Lake beyond the work site, stacking, spreading, etc. complete | 6,788.1 | Cum | 31 | ₹2,10,431.1 |
| 3 | Conveying materials obtained from Lake including all lifts, laying in layers of 20 cm. to 30 cm. breaking clods, dressing to the required lines, curves, grade sand section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500 m. inclusive, from the site of excavation to the site of deposition as directed.
25 % to Farm | 1,697.03 | Cum | 35.75 | ₹60,668.64 |
| 4 | 75 % to Dump Yard | 5,091.08 | Cum | 432.3 | ₹22,00,871.72 |
| 5 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and a like grass along roadside making the ground clean by showel and phavaras etc. complete. | 5,340.97 | Sqm | 7.7 | ₹41,125.49 |
| 6 | SUB WORK NO 2 - Gabion Wall
Providing and Constructing gabion structure 1Meter high or required section madeup of soft mechanically woven hexagonal shaped G.I. wire confirming to IS 16014:2012 having zinc plus PVC coating of overall diameter of 3.7 mm and tying lacing wire of 3.2 mm with edge wire confirming to overall diameter 4.4 mm edges being mechanically selvedged including placing inposition, fitting neatly with trap stone rubble (15 to 23 cm ) all loose ends to be securely tied (Excluding transportation) etc. complete. (In Dry condition and for under water installation extra cost to be considered) | 838.31 | Cum | 4,739.9 | ₹39,73,489.26 |
| 7 | Filling in plinth and floors with approved Excavated material in 15 cm to 20 cm layers including watering and compaction etc. complete. | 528.31 | Cum | 132 | ₹69,736.63 |
| 8 | SUB WORK NO 3 - Earthen Bank Protection Work Providing and Constructing gabion structure 1Meter high or required section madeup of soft mechanically woven hexagonal shaped G.I. wire confirming to IS 16014:2012 having zinc plus PVC coating of overall diameter of 3.7 mm and tying lacing wire of 3.2 mm with edge wire confirming to overall diameter 4.4 mm edges being mechanically selvedged including placing inposition, fitting neatly with trap stone rubble (15 to 23 cm ) all loose ends to be securely tied (Excluding transportation) etc. complete. (In Dry condition and for under water installation extra cost to be considered) | 661.03 | Cum | 4,739.9 | ₹31,33,238.09 |
| 9 | Filling in plinth and floors with approved Excavated material in 15 cm to 20 cm layers including watering and compaction etc. complete. | 267.7 | Cum | 132 | ₹35,336.77 |
| 10 | Filling in plinth and floors with contractors material / brought from out side and approved by Engineer in charge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 3,169.08 | Cum | 658.9 | ₹20,88,103.52 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
NIT.pdf
Tender Documents • 2.16 MB
SBD.pdf
Other Document • 2.55 MB
PQ.pdf
Additional Documents • 0.22 MB
BOQ_2210129.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .