| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 CrAccepted-AOC | ₹10.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.2 CrRejected-Finance | ₹10.2 Cr | L2 | Rejected-Finance 2 |
| 3 | L3₹10.2 CrRejected-Finance | ₹10.2 Cr | L3 | Rejected-Finance 3 |
| 4 | L4₹10.6 CrRejected-Finance 292C FRIENDS COLONY ETAWAH | ₹10.6 Cr | L4 | Rejected-Finance 4 |
| 5 | Not Admitted-Fee/PreQual/Technical ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.2 Cr
EMD Value
₹20.4 L
Closing Date
7 Feb 2025, 12:00 pmClosed
Superintending Engineer
ETAWAH CIRCLE PWD ETAWAH
Financial year 2024-25 of Muradganj Phaphund road (ODR) in the Strengthening work
2025_CEKNP_1000088_1
6219/55C-EV/2024 DATE 11-12-2024
Open Tender
Civil Works - Roads
365 days
AURAIYA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹20.4 L
Yes
ETAWAH
21 Mar 2025
30 Jan 2025
7 Feb 2025
30 Jan 2025
7 Feb 2025
30 Jan 2025
4 Feb 2025
Amount
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
Providing, laying, spreading of graded stone aggregate(WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(mechanical Means)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC M15 grade 9.14 A
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & manual placing
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Part-B Maintainance Charge including @ Earth work, repair of painted surface, Earth work on patri, Culvert etc as per Direction of E/I for the period of Five Year from the actual completion of work Total of Work Amount 1 to 13 (Excluding GST)
Maintainance of First Year (@ 0.00% of Total Work Amount 1 to 13)
Maintainance of Second Year (@ 0.25% of Total Work Amount 1 to 13)
Maintainance of Third Year (@ 0.50% of Total Work Amount 1 to 13)
Maintainance of Fourth Year (@ 0.75% of Total Work Amount 1 to 13)
Maintainance of Fifth Year (@ 1.00% of Total Work Amount 1 to 13)
M/S YATINDRA KUMAR TRIPATHI (BID ID -4919304)
M P SINGH TOMAR (BID ID -4921822)
M/S DEV BUILDERS (BID ID -4923215)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid