| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC GOROIMARI BAZAR TUKRAPARA CHHAYGAON KAMRUP R ASSAM | CHHAYGAON | KAMRUP R | ASSAM | ₹4.9 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L1₹4.9 CrRejected-AOC BIRUBARI ROAD GOPINATH NAGAR BIRUBARI GUWAHATI KAMRUP M ASSAM 781016 | GUWAHATI | KAMRUP M | ASSAM | 781016 | ₹4.9 Cr | L1 | Rejected-AOC Not Qualified for AOC |
| 3 | L1₹4.9 CrRejected-AOC | ₹4.9 Cr | L1 | Rejected-AOC Not Qualified for AOC |
| 4 | L1₹4.9 CrRejected-AOC 3RD FLOOR KRISHNA RICE MILL BUILDING PAGLASTHAN BONGAIGAON 783380 | BONGAIGAON | ASSAM | 783380 | ₹4.9 Cr | L1 | Rejected-AOC Not Qualified for AOC |
| 5 | L1₹4.9 CrRejected-AOC 10TH APBN KALAPAHAR GUWAHATI KAMRUP M ASSAM | KAMRUP | ASSAM | 781030 | ₹4.9 Cr | L1 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | PADMAVATI CONSTRUCTION L1 | Ashit Roy L1 | AVIGHNA ASSOCIATES L1 | PG CONSTRUCTION L1 | Maniraj Brahma L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Light Jungles: Clearing light jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed.
( When 30% of the area is covered by shrubs,trees etc). | 31,020 | Sqm | 9.32 ₹2,89,106.4 Lowest | 9.32 ₹2,89,106.4 Lowest | 9.32 ₹2,89,106.4 Lowest | 9.32 ₹2,89,106.4 Lowest | 9.33 ₹2,89,416.6 |
| 2.00 | Earthwork in bank trimming to the designed section /slope by manual means including removing the trimmed soils to a minimum distance of 30 m, complete as directed. | 2,462.94 | Cum | 136 ₹3,34,959.84 | 129.97 ₹3,20,108.31 | 129.95 ₹3,20,059.05 Lowest | 129.95 ₹3,20,059.05 Lowest | 129.95 ₹3,20,059.05 Lowest |
| 3.00 | Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete conforming to IS 1343 : 2012 using super-plasticizer @1.2 lit/bag of cement with graded broken coarse aggregates up to 20mm size down conforming to IS 10262:2009 & IS 456:2000 and reinforced with 4 Nos. of 4 mm dia high tensile steel wire cable / strand with necessary cover and 4 mm high tensile stirrups at 250mm C/C, in conformity with IS-6403:R2002 and stressed to required strength not exceeding 9.18 N/mm, holes of 16 mm dia at 50 cm inside from both ends in the same face and in either face of post another 2 Nos. of holes of size 16 mm dia at 65mm inside from both ends including properly curing for 21 (twenty one) days and carriage of porcupine members from factory to the stack yard within a distance up to 50 Km including loading, unloading & stacking complete as directed. | 33,996 | member | 1,013 ₹3,44,37,948 Lowest | 1,013.3 ₹3,44,48,146.8 | 1,013.3 ₹3,44,48,146.8 | 1,013.3 ₹3,44,48,146.8 | 1,013.3 ₹3,44,48,146.8 |
| 4.00 | Carriage of PSC porcupine members of size 0.10m X 0.10m X 3.00m from Stack yard to Work Site including loading, unloading & stacking.
Distance=90km | 33,996 | member | 222 ₹75,47,112 | 221.82 ₹75,40,992.72 Lowest | 221.82 ₹75,40,992.72 Lowest | 221.82 ₹75,40,992.72 Lowest | 221.82 ₹75,40,992.72 Lowest |
| 5.00 | Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching, erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m)
Without Boat | 650 | porcupine | 644.32 ₹4,18,808 | 644.34 ₹4,18,821 | 644.3 ₹4,18,795 | 644.3 ₹4,18,795 | 644.21 ₹4,18,736.5 Lowest |
| 6.00 | Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching, erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m)
With Boat | 5,016 | porcupine | 1,151 ₹57,73,416 Lowest | 1,151.25 ₹57,74,670 | 1,151.28 ₹57,74,820.48 | 1,151.28 ₹57,74,820.48 | 1,151.23 ₹57,74,569.68 |
| 7.00 | Hire charge of engine boat with minimum 10 HP engine and load carrying capacity of not less than 3.00 ton along with operator and helpers excluding cost of P.O.L. | 45 | Each | 3,535.72 ₹1,59,107.4 Lowest | 3,747 ₹1,68,615 | 3,745.41 ₹1,68,543.45 | 3,745.41 ₹1,68,543.45 | 3,745.39 ₹1,68,542.55 |
| 8.00 | Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at least 0.75 m below ground and height above plinth of 2.5 m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed.
(Using Bhaluka Bamboo at the rate of 6.00 nos./Rm & Jati Bamboo at the rate of 61.00 nos./Rm) | 21.6 | Sqm | 2,252.1 ₹48,645.36 | 2,251.98 ₹48,642.77 | 2,251.81 ₹48,639.1 Lowest | 2,251.81 ₹48,639.1 Lowest | 2,251.81 ₹48,639.1 Lowest |
Tender Value
₹5.4 Cr
EMD Value
₹10.9 L
Closing Date
24 Feb 2025, 2:00 pmClosed
Chief Engineer, WRD, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
Protection of Gobindapur-Tinkonia area from the erosion of river Brahmaputra on its R/B.
2025_DoWR_42504_1
BONGAIGAON/2024-25/RIDF-II/I
Open Tender
Civil Works
Works
365 days
BONGAIGAON
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹10.9 L
Yes
8 Aug 2025
4 Feb 2025
24 Feb 2025
4 Feb 2025
24 Feb 2025
14 Feb 2025
Amount
Light Jungles: Clearing light jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% of the area is covered by shrubs,trees etc).
Earthwork in bank trimming to the designed section /slope by manual means including removing the trimmed soils to a minimum distance of 30 m, complete as directed.
Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-30 grade of cement concrete conforming to IS 1343 : 2012 using super-plasticizer @1.2 lit/bag of cement with graded broken coarse aggregates up to 20mm size down conforming to IS 10262:2009 & IS 456:2000 and reinforced with 4 Nos. of 4 mm dia high tensile steel wire cable / strand with necessary cover and 4 mm high tensile stirrups at 250mm C/C, in conformity with IS-6403:R2002 and stressed to required strength not exceeding 9.18 N/mm, holes of 16 mm dia at 50 cm inside from both ends in the same face and in either face of post another 2 Nos. of holes of size 16 mm dia at 65mm inside from both ends including properly curing for 21 (twenty one) days and carriage of porcupine members from factory to the stack yard within a distance up to 50 Km including loading, unloading & stacking complete as directed.
Carriage of PSC porcupine members of size 0.10m X 0.10m X 3.00m from Stack yard to Work Site including loading, unloading & stacking. Distance=90km
Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching, erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m) Without Boat
Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching, erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m) With Boat
Hire charge of engine boat with minimum 10 HP engine and load carrying capacity of not less than 3.00 ton along with operator and helpers excluding cost of P.O.L.
Construction of temporary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart, driven at least 0.75 m below ground and height above plinth of 2.5 m. Split Jatti bamboo/tarza wall 10 cm thick touch roofing over bamboo rua frame, placing at 0.15 m clear apart, fitted with bamboo kamies from binding doors and windows with Bamboo Chattai, strengthening with Bamboo frame binding with wire, roofing with TATA Shaktee roofing sheets etc., complete as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos./Rm & Jati Bamboo at the rate of 61.00 nos./Rm)
Ashit Roy (BID ID -258895)
PADMAVATI CONSTRUCTION (BID ID -258380)
AVIGHNA ASSOCIATES (BID ID -259018)
PG CONSTRUCTION (BID ID -259158)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_68239.xls
BOQ • 0.37 MB
162466746.pdf
Tender Documents • 0.13 MB
162466748.html
Tender Documents • 0.05 MB
tinikonia_bid.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .