Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹35.2 L+₹75,420.06 (2.19%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹35.4 L+₹1.0 L (2.92%)Admitted-Finance UTTAR PRADESH UTTAR PRADESH | L3 | Admitted-Finance | ||
| 4 | L4₹36.2 L+₹1.8 L (5.11%)Admitted-Finance 30 AMBEDKAR VIHAR YOJANA CHO CHOWK PRAYAGRAJ | L4 | Admitted-Finance |
Tender Value
₹25.1 L
EMD Value
₹50,280
Closing Date
23 Sept 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-07 Ward-16 Bahmalpur, Ward-56 Phaphamau, Ward-37 Shantipuram me damar dwara nirmit vibhinn mohallo ki sadkon par jagah-jagah kshatigrast gaddhon par bitumin dwara patch marammat karya.
2026_NNAMC_1186948_17
23.08.2026
Open Tender
Civil Works
Percentage
30 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
AS PER DOCS
₹50,280
25 Sept 2026
18 Sept 2026
23 Sept 2026
18 Sept 2026
23 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scraping the exiating old damage bitumins road surface including all complete work | 2,964.5 | sqm | 33 | ₹97,828.5 |
| 2 | Earth work cutting/ordinary soil upto 1.5m lift upto 30 m with all complete work (S.I.No.253) | 64.56 | cum | 87.3 | ₹5,636.09 |
| 3 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 81.4 | cum | 1,654.8 | ₹1,34,700.72 |
| 4 | Providing&Applying of tack coat at the rate of 0.25kg/sqm includig material laboured all complition of work | 5,135.25 | cum | 15.3 | ₹78,569.33 |
| 5 | Providing & Laying D.G.B.M.-50mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumen VG-30 grade bluk @3.40% of weight of mix and including all completion of work as per MORT 7 Hspecification-504 | 54.27 | cum | 11,335.1 | ₹6,15,155.88 |
| 6 | Providing & Laying B.C-30 mm thick with 100-120TPH hot mix plant producing an average out put 75 tones per hour using crushed of aggregates of specified grading and premixed with bitumenC.R.M.B bluk55grade @5.00% of weight of mix and including all completion of work as per MORT & Hspecification-508 | 121.5 | cum | 12,798.1 | ₹15,54,969.15 |
| 7 | Cartage of earth upto 5 km. distance from site with all complete work. | 147.92 | cum | 183.5 | ₹27,142.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_2234949.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .