Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23,048Accepted-AOC NARAHARYAN ROAD DIST COOCH BEHAR | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.8 L+₹31,678 (3.73%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.9 L+₹36,532 (4.30%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹8.9 L+₹38,151 (4.49%)Rejected-AOC TUFANGANJ DHADIYAL COOCH BEHAR WB 736159 | TUFANGANJ | COOCH BEHAR | WEST BENGAL | 736159 | L4 | Rejected-AOC L4 | |
| 5 | L5₹9.7 L+₹1.2 L (14.0%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | TOTAL ENGINEERING CONSULTING HOUSE L3 | AHAMED ALI MANDAL L4 | PARTHA PRATIM SAHA L2 | RAJIB SAHA L5 | M/S. SUBHAJIT DEY CHAUDHURI & CO L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Maintenance of forests road at Chilapata & Bania Beat over 3.4 KM under Chilapata Range | 1 | Nos | 1,90,762 ₹1,90,762 | 1,91,110 ₹1,91,110 | 1,90,000 ₹1,90,000 | 2,08,481 ₹2,08,481 | 1,82,895 ₹1,82,895 Lowest |
| 2.00 | Maintenance of forests road at Mendabari Beat over 1.1 KM under Chilapata Range | 1 | Nos | 61,716 ₹61,716 | 61,829 ₹61,829 | 61,000 ₹61,000 | 67,449 ₹67,449 | 59,171 ₹59,171 Lowest |
| 3.00 | Maintenance of Causeway (7M) at Bania and Chilapata beat over 2 nos under Chilapata Range | 2 | Nos | 64,562 ₹1,29,124 | 64,680 ₹1,29,360 | 64,000 ₹1,28,000 | 70,559 ₹1,41,118 | 61,899 ₹1,23,798 Lowest |
| 4.00 | Maintenance of Small Culvert (6.5M) at Kodalbasti Beat & Mantharam Beat under Kodalbasti Range | 2 | Nos | 67,302 ₹1,34,604 | 67,425 ₹1,34,850 | 67,000 ₹1,34,000 | 73,554 ₹1,47,108 | 64,527 ₹1,29,054 Lowest |
| 5.00 | Maintenance of Causeway (5.5 MTR) under Kodalbasti Range | 2 | Nos | 50,169 ₹1,00,338 | 50,261 ₹1,00,522 | 50,000 ₹1,00,000 | 54,829 ₹1,09,658 | 48,100 ₹96,200 Lowest |
| 6.00 | Maintenance of Forest roads over 3.4 KM under Kodalbsti Range | 1 | Nos | 1,90,762 ₹1,90,762 | 1,91,110 ₹1,91,110 | 1,90,000 ₹1,90,000 | 2,08,481 ₹2,08,481 | 1,82,895 ₹1,82,895 Lowest |
| 7.00 | Maintenance of Forest roads over 1.4 KM under Kodalbsti Range | 1 | Nos | 78,548 ₹78,548 | 78,692 ₹78,692 | 78,000 ₹78,000 | 85,845 ₹85,845 | 75,309 ₹75,309 Lowest |
Tender Value
₹11.5 L
EMD Value
₹23,048
Closing Date
8 Sept 2025, 2:00 pmClosed
DFO, JPWLD
DFO, JALDAPARA WILDLIFE DIVISION, NILKUTHI, COOCH BEHAR-736101
Maintenance of forest roads, causeways, culverts, wooden bridge and watch towers etc. at Kodalbasti and Chilapata Range under Jaldapara Wildlife Division
2025_DOFR_893106_1
WBFOR/JWD/NIT41 (e)/2025-26
Open Tender
Project Work
Item Rate
120 days
AS STATED IN NIT 41
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
₹23,048
4 Nov 2025
21 Aug 2025
10 Sept 2025
21 Aug 2025
8 Sept 2025
21 Aug 2025
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .