Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹13.9 L+₹40,574.44 (3.01%)Rejected-Finance | L2 | Rejected-Finance HigherRate and amount | |
| 3 | L3₹14.8 L+₹1.3 L (9.61%)Rejected-Finance | L3 | Rejected-Finance Higher |
Tender Value
Refer Docs
EMD Value
₹18,511
Closing Date
7 Oct 2024, 5:00 pmClosed
SUPERINTENDING ENGINEER O and MC I 2X200MW Obra UP
SUPERINTENDING ENGINEER O and MC I 2X200MW Obra UP 231219
Dual Year Mechanical maintenance of, ESP of 5x200MW, B TPS, Obra.
2024_RVUNL_945710_1
N-OBR////6000005695_00
Open Tender
Miscellaneous Works
Item Rate
730 days
Ash handling division of 5X200MW BTPS, Obra
as per tender documents
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO BTPS Obra
₹18,511
12 Jan 2025
14 Aug 2024
10 Oct 2024
14 Aug 2024
7 Oct 2024
14 Aug 2024
14 Aug 2024 - 7 Oct 2024
Amount
Cleaning of complete structure, electrodes, insulator bushing and shock bars of one field and connected two Nos. hoppers of ESP by wire brush, compresses air opening hopper side & top manhole.
Cleaning of complete two Nos. Hoppers of one field of ESP.
Replacement of damaged motor gear of rapping system.
Repairing of damaged rapping gear box.
Servicing of rapping gear box coupling bearing block.
Straightening of bend collecting electrodes.
Removal & fixing the collecting electrodes.
Repairing of bend collecting electrodes in ESP in fixed condition.
Removal of damaged emitting electrodes and fixing.
Servicing/repair/replacement of rapping hammer.
Repair/replacement of bend shock bar.
Straightening of rapping shaft.
Repair/fixing and welding of ash deflector plate.
Two coat of continuous run of welding on ESP ash hopper, ESP roof, other places in ESP.
Fabrication and erection of new deflector plates in ash hopper.
Inspection and checking of fields and removal of minor defects.
Replacement of asbestos rope of ESP top manholes, side manholes and ESP hopper manholes.
i) ESP top manholes
ii) ESP side manholes
iii) ESP hopper manholes.
Fixing of collecting electrodes with new clamp by welding.
Straightening of bend stay guide bar of collecting structure.
Replacement of damaged shaft insulator by new one.
Replacement of the damaged support insulator by new or replacement of sealing asbestos rope of size 20 mm & 10/8 mm.
Repair of support insulator screen pipe of ESP.
Replacement of plain bearing by new one if required.
Repair/replacement of shock bar guides, front, rear and support hook by welding and grinding wherever required.
Repair/replacement of coupling of reduction gear box of emitting/collecting rapping system.
Repairing or emitting frame by patch welding.
Replacement of damaged bracing pipe at ESP inlet.
Replacement/repair or vertical stay of emitting frame of ESP.
Repairing of man hole by replacing the damaged plate portion with new one.
Attending leakages of flue gas duct from ESP inlet gate to ESP outlet gate.
Repairing of ESP inlet duct to ESP outlet duct welding of new plates inside the duct.
Fabrication & replacement of expansion joints bellows/baffle plate.
INDIA ENGINEERING WORKS (BID ID -4569671)
M/S NISHA ENTERPRISES (BID ID -4588941)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .