| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC 00 BALIHAWAN DEH MAFI BALIHAWAN DEH MAFI KAUSHAMBI KAUSHAMBI UTTAR PRADESH 212202 | KAUSHAMBI | UTTAR PRADESH | 212202 | ₹1.6 Cr | L1 | Accepted-AOC bond |
| 2 | L2₹1.6 Cr+₹2.1 L (1.39%)Rejected-Finance | ₹1.6 Cr+₹2.1 L (1.39%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 Cr+₹16.8 L (10.8%)Rejected-Finance 1421 7Y BLOCK KIDWAI NAGAR KANPUR NAGAR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹1.7 Cr+₹16.8 L (10.8%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.9 Cr
EMD Value
₹11.6 L
Closing Date
28 May 2026, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Thariyaon Asothar marg se Bhairawa sampark marg per Esthit sasur khaderi River per 5x6 m Span ke Laghu setu, (Box Culvert) approach road, additional approach road and Protection work
2026_CEALD_1150876_1
1210/95C-ETENDERING/PFC/2026 DT. 17.03.2026
Open Tender
Civil Works - Bridges
Fixed-rate
365 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹11.6 L
Pratapgarh Circle, PWD, Pratapgarh
23 Jul 2026
20 May 2026
28 May 2026
20 May 2026
28 May 2026
20 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A APPROACH ROAD + PART B ADDITIONAL APPROACH ROAD Construction of embankment with approved material obtained from borrow pits with all lift and lead upto 1.00 km, Transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.2 ( Cartage Earth work 1 Km) The Compacted thickness of each layer shall not be more than 200 mm (Including labour cess but Excluding GST) | 14,465 | cum | 108 | ₹15,62,220 |
| 2 | Providing, laying, spreading Material on prepared sub grade by adding cement @ 2% by weight of the spread Material manually by mixing in place with rotavator compacting with vi roller at OMC to achieve the desired unconfined compressive strength and form a layer of subbase. (Including labour cess, Royalty but Excluding GST) | 294 | cum | 3,285 | ₹9,65,790 |
| 3 | Providing, laying and spreading Material on prepared sub base adding cement @ 4% by weight of the spread Material manually by mixing in place with rotavator compacting with road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. (Including labour cess, Royalty but Excluding GST) | 399 | cum | 3,635 | ₹14,50,365 |
| 4 | Providing and applying tack coat with Bitumen VG10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MORD Specification Clause 503. (Including labour cess but Excluding GST) | 2,850 | sqm | 15 | ₹42,750 |
| 5 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG 10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per MORD Specification Clause 508. (Including labour cess, Royalty but Excluding GST) | 2,850 | sqm | 173 | ₹4,93,050 |
| 6 | Providing and laying seal coat sealing the voids in a bituminous VG10 surface laid to the specified levels, grade and cross fall using Type C as per MORD Specification Clause 510 (Including labour cess, Royalty but Excluding GST) | 2,850 | sqm | 63 | ₹1,79,550 |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lift upto 1.50 m & lead upto 30 m as per Technical Specification Clause 303.1. (Including labour cess but Excluding GST) | 14,384 | cum | 98 | ₹14,09,632 |
| 8 | PART C MINER BRIDGE WORK Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Including labour cess but Excluding GST) | 5.1 | Cum | 718 | ₹3,663.95 |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of, Reinforced cement concrete, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Including labour cess but Excluding GST) | 48.51 | cum | 829 | ₹40,214.79 |
| 10 | Construction of granular sub-base Dismentelled Material of Existing culvert by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(Only Labour Work) For Diversion (Including labour cess, Royalty but Excluding GST) | 53.61 | cum | 263 | ₹14,100.22 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2155493.xls
BOQ • 0.31 MB
T2_ThariyaonBhairwan.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .