Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-Finance | ₹17.1 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹17.4 L+₹35,488.64 (2.08%)Accepted-Finance | ₹17.4 L+₹35,488.64 (2.08%) | L2 | Accepted-Finance Accepted |
Tender Value
₹17.7 L
EMD Value
₹35,489
Closing Date
13 Jul 2026, 3:00 pmClosed
EE, SVPND, APWD, Sri Vijaya Puram
EE, SVPND, APWD, Sri Vijaya Puram
A/R and M/O Non-Residential Building under SVPND, APWD, Sri Vijaya Puram during 2026-27. SW_Improvement of drainage system APWD quarter behind SVPND under Marine Section, APWD, Sri Vijaya Puram during 2026-27.
2026_APWD_23440_1
NIT No. 27/EE/SVPND/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Sri Vijaya Puram
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹35,489
24 Jul 2026
20 Jun 2026
14 Jul 2026
20 Jun 2026
13 Jul 2026
22 Jun 2026
20 Jun 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | |||||
| 1.1 | All kinds of soil | - | cum | 1 | - |
| 2Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 2.1 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | - | cum | - | - |
| 3 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 1 | cum | 1 | ₹1 |
| 4Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 4.1 | Beyond 60 cm girth upto and including 120 cm girth | - | each | - | - |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 1 | ₹1 |
| 5.2 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 1 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
TenderDocNIT27.pdf
Tender Documents • 1.18 MB
Instructions-to-bidders.pdf
Other Documents • 0.33 MB
BOQ_24849.xls
BOQ • 0.37 MB
Corrigendum2031.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .